A platform for research: civil engineering, architecture and urbanism
Complex geological comprehensive pipe gallery and construction method
The invention discloses a complex geological comprehensive pipe gallery and a construction method, and belongs to the technical field of pipe gallery construction. The complex geological comprehensive pipe gallery is characterized by comprising a tunneling pipeline and a jacking pipeline which are connected through a connecting male end and a connecting female end which are matched; a wedge-shaped clamping groove is formed in the inner side wall of the connecting female end; a limiting block which extends out of the connecting male end and is in contact with the inner side wall of the connecting female end is arranged on the inner side wall of the connecting male end; an elastic piece is embedded in the limiting block; and the elastic piece extends out of the limiting block and is connected with a wedge-shaped block matched with the wedge-shaped clamping groove. According to the complex geological comprehensive pipe gallery, the adjacent pipelines are connected through the connecting male end and the connecting female end, in the pipe jacking process, the adjacent pipelines do not move, the connected pipelines have axial consistency as a whole, and smooth pipe jacking operation is facilitated. In the construction process of the complex geological comprehensive pipe gallery, the construction time can be shortened, the construction cost can be reduced, and the construction efficiency can be improved.
本发明公开了一种复杂地质综合管廊及施工方法,属于管廊施工技术领域。一种复杂地质综合管廊,其特征在于,包括:通过配合的连接公端和连接母端连接的掘进管道和顶压管道;连接母端的内侧壁设有楔形卡槽;连接公端的内侧壁设有伸出连接公端并与连接母端的内侧壁接触的限位块,限位块的内部埋设有弹性件,弹性件伸出限位块并且弹性件连接有与楔形卡槽相配合的楔形块。本发明的复杂地质综合管廊中相邻管道之间通过连接公端和连接母端进行连接,在顶管过程中,相邻管道之间不会出现位移,确保连接后的管道整体具有轴向一致性,便于顶管操作的顺利进行。复杂地质综合管廊在施工过程中,能够缩短施工时间、降低施工成本以及提高施工效率。
Complex geological comprehensive pipe gallery and construction method
The invention discloses a complex geological comprehensive pipe gallery and a construction method, and belongs to the technical field of pipe gallery construction. The complex geological comprehensive pipe gallery is characterized by comprising a tunneling pipeline and a jacking pipeline which are connected through a connecting male end and a connecting female end which are matched; a wedge-shaped clamping groove is formed in the inner side wall of the connecting female end; a limiting block which extends out of the connecting male end and is in contact with the inner side wall of the connecting female end is arranged on the inner side wall of the connecting male end; an elastic piece is embedded in the limiting block; and the elastic piece extends out of the limiting block and is connected with a wedge-shaped block matched with the wedge-shaped clamping groove. According to the complex geological comprehensive pipe gallery, the adjacent pipelines are connected through the connecting male end and the connecting female end, in the pipe jacking process, the adjacent pipelines do not move, the connected pipelines have axial consistency as a whole, and smooth pipe jacking operation is facilitated. In the construction process of the complex geological comprehensive pipe gallery, the construction time can be shortened, the construction cost can be reduced, and the construction efficiency can be improved.
本发明公开了一种复杂地质综合管廊及施工方法,属于管廊施工技术领域。一种复杂地质综合管廊,其特征在于,包括:通过配合的连接公端和连接母端连接的掘进管道和顶压管道;连接母端的内侧壁设有楔形卡槽;连接公端的内侧壁设有伸出连接公端并与连接母端的内侧壁接触的限位块,限位块的内部埋设有弹性件,弹性件伸出限位块并且弹性件连接有与楔形卡槽相配合的楔形块。本发明的复杂地质综合管廊中相邻管道之间通过连接公端和连接母端进行连接,在顶管过程中,相邻管道之间不会出现位移,确保连接后的管道整体具有轴向一致性,便于顶管操作的顺利进行。复杂地质综合管廊在施工过程中,能够缩短施工时间、降低施工成本以及提高施工效率。
Complex geological comprehensive pipe gallery and construction method
一种复杂地质综合管廊及施工方法
CHEN JING (author) / CAO KUANKUAN (author) / LI XIAOGE (author)
2021-04-27
Patent
Electronic Resource
Chinese
Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
European Patent Office | 2020
|Construction method of comprehensive pipe gallery and long-section pipe gallery
European Patent Office | 2022
|