Foam light soil widening height highway embankment construction method
The invention relates to the technical field of highway construction, in particular to a foam light soil widening height highway embankment construction method which comprises the following steps: firstly, excavating a foundation and a slope of an old road; excavating a foundation pit along the pouring side boundary, and pouring panel foundation concrete into the foundation pit; then installing a panel on the panel foundation concrete, and transversely installing a plurality of partition plates along the road; then pouring a foam light soil roadbed in a pouring cavity defined by the panels, the side slopes of the old road and the two adjacent partition plates; then laying a top layer ground galvanized metal net, and pouring top layer foam light soil; and finally, performing foam light soil maintenance. A pouring cavity is defined by the face plate, the side slope of the old road and the two adjacent partition plates, and a foam light soil roadbed is poured in the pouring cavity. The roadbed is vertically and upwards overlapped for construction, a side slope is not formed on the edge of the roadbed, and excessive land resources are not occupied. Pouring does not need vibration, self-leveling is achieved, efficiency is high, large equipment is not needed, and the requirement for the site is low.
本发明涉及公路施工的技术领域,具体而言,涉及泡沫轻质土拼宽高度公路路堤施工方法,包括如下步骤:先开挖地基和老路的边坡;随后沿浇筑的边线开挖基坑并在基坑内浇筑面板基础混凝土。然后在面板基础混凝土上安装面板,并沿公路横向安装若干隔板。然后在面板、老路的边坡和相邻的两个隔板围合的浇筑腔内浇筑泡沫轻质土路基。然后铺设顶层地面镀锌金属网,浇筑顶层泡沫轻质土;最后泡沫轻质土养护。通过面板、老路的边坡和相邻的两个隔板围合的浇筑腔,并在浇筑腔内浇筑泡沫轻质土路基。使得路基垂直向上叠加施工,路基边沿不形成边坡,不占用过多的土地资源。浇筑无需振捣,自流平,效率高,无需大型设备,对场地要求低。
Foam light soil widening height highway embankment construction method
The invention relates to the technical field of highway construction, in particular to a foam light soil widening height highway embankment construction method which comprises the following steps: firstly, excavating a foundation and a slope of an old road; excavating a foundation pit along the pouring side boundary, and pouring panel foundation concrete into the foundation pit; then installing a panel on the panel foundation concrete, and transversely installing a plurality of partition plates along the road; then pouring a foam light soil roadbed in a pouring cavity defined by the panels, the side slopes of the old road and the two adjacent partition plates; then laying a top layer ground galvanized metal net, and pouring top layer foam light soil; and finally, performing foam light soil maintenance. A pouring cavity is defined by the face plate, the side slope of the old road and the two adjacent partition plates, and a foam light soil roadbed is poured in the pouring cavity. The roadbed is vertically and upwards overlapped for construction, a side slope is not formed on the edge of the roadbed, and excessive land resources are not occupied. Pouring does not need vibration, self-leveling is achieved, efficiency is high, large equipment is not needed, and the requirement for the site is low.
本发明涉及公路施工的技术领域,具体而言,涉及泡沫轻质土拼宽高度公路路堤施工方法,包括如下步骤:先开挖地基和老路的边坡;随后沿浇筑的边线开挖基坑并在基坑内浇筑面板基础混凝土。然后在面板基础混凝土上安装面板,并沿公路横向安装若干隔板。然后在面板、老路的边坡和相邻的两个隔板围合的浇筑腔内浇筑泡沫轻质土路基。然后铺设顶层地面镀锌金属网,浇筑顶层泡沫轻质土;最后泡沫轻质土养护。通过面板、老路的边坡和相邻的两个隔板围合的浇筑腔,并在浇筑腔内浇筑泡沫轻质土路基。使得路基垂直向上叠加施工,路基边沿不形成边坡,不占用过多的土地资源。浇筑无需振捣,自流平,效率高,无需大型设备,对场地要求低。
Foam light soil widening height highway embankment construction method
泡沫轻质土拼宽高度公路路堤施工方法
CHEN YAN (author) / ZHENG GUO (author) / TAO XUANJUN (author) / WEN DALONG (author) / ZHAO YULONG (author) / LUO YI (author)
2021-05-25
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Highway embankment structure for splicing and widening environment-friendly foam light soil
European Patent Office | 2022
|Highway embankment widening structure and construction method thereof
European Patent Office | 2023
|Construction method of pile casing foam light soil highway embankment
European Patent Office | 2021
|Construction method of cast-in-place concrete full-protection foam light soil widening embankment
European Patent Office | 2023
|Application of Geogrid in Widening Highway Embankment
ASCE | 2011
|