A platform for research: civil engineering, architecture and urbanism
Construction joint formwork supporting system and construction method thereof
The invention relates to a construction joint formwork supporting system and a construction method thereof. The construction joint formwork supporting system comprises a supporting plate, a supporting column is arranged on the supporting plate, a rotating rod is arranged on the supporting column, a first installing ring and a second installing ring are arranged on the rotating rod, a first abutting rod is arranged on the first installing ring, the second installing ring is provided with a second abutting rod with the length larger than that of the first abutting rod, the supporting plate is provided with a driving mechanism used for driving the rotating rod to rotate, the construction method of the construction joint formwork supporting system comprises the following steps that the outer side form boards are erected, and the inner side form boards and a reinforcing mesh are placed; a casing pipe is placed, and a split bolt penetrates and is tightened; the supporting system is placed between the two inner side form boards, a motor is started, a first abutting rod and a second abutting rod abut against the two inner side form boards, and concrete is poured; and the motor is started, abutting of the first abutting rod and the second abutting rod on the inner side form boards is relieved, and the supporting system is taken out. The construction joint formwork supporting system and the construction method thereof have the effects that the inner side form boards at the construction joint between non-parallel walls is supported, and the construction efficiency is improved.
本申请涉及施工缝模板支撑系统及其施工方法,施工缝模板支撑系统,包括支撑板,支撑板上设有支撑柱,支撑柱上设有转动杆,转动杆上设有第一安装环和第二安装环,第一安装环上设有第一抵压杆,第二安装环上设有长度大于第一抵压杆的第二抵压杆,支撑板上设有用于驱动转动杆转动的驱动机构。施工缝模板支撑系统的施工方法如下:支设外侧模板,放置内侧模板和钢筋网;放置套管,穿入并收紧对拉螺栓;将支撑系统放置于两内侧模板间,启动电机,使第一抵压杆和第二抵压杆抵紧于两内侧模板,浇筑混凝土;启动电机,解除第一抵压杆和第二抵压杆对内侧模板的抵紧,取出支撑系统。本申请具有支撑非平行墙体间施工缝处的内侧模板、提高施工效率的效果。
Construction joint formwork supporting system and construction method thereof
The invention relates to a construction joint formwork supporting system and a construction method thereof. The construction joint formwork supporting system comprises a supporting plate, a supporting column is arranged on the supporting plate, a rotating rod is arranged on the supporting column, a first installing ring and a second installing ring are arranged on the rotating rod, a first abutting rod is arranged on the first installing ring, the second installing ring is provided with a second abutting rod with the length larger than that of the first abutting rod, the supporting plate is provided with a driving mechanism used for driving the rotating rod to rotate, the construction method of the construction joint formwork supporting system comprises the following steps that the outer side form boards are erected, and the inner side form boards and a reinforcing mesh are placed; a casing pipe is placed, and a split bolt penetrates and is tightened; the supporting system is placed between the two inner side form boards, a motor is started, a first abutting rod and a second abutting rod abut against the two inner side form boards, and concrete is poured; and the motor is started, abutting of the first abutting rod and the second abutting rod on the inner side form boards is relieved, and the supporting system is taken out. The construction joint formwork supporting system and the construction method thereof have the effects that the inner side form boards at the construction joint between non-parallel walls is supported, and the construction efficiency is improved.
本申请涉及施工缝模板支撑系统及其施工方法,施工缝模板支撑系统,包括支撑板,支撑板上设有支撑柱,支撑柱上设有转动杆,转动杆上设有第一安装环和第二安装环,第一安装环上设有第一抵压杆,第二安装环上设有长度大于第一抵压杆的第二抵压杆,支撑板上设有用于驱动转动杆转动的驱动机构。施工缝模板支撑系统的施工方法如下:支设外侧模板,放置内侧模板和钢筋网;放置套管,穿入并收紧对拉螺栓;将支撑系统放置于两内侧模板间,启动电机,使第一抵压杆和第二抵压杆抵紧于两内侧模板,浇筑混凝土;启动电机,解除第一抵压杆和第二抵压杆对内侧模板的抵紧,取出支撑系统。本申请具有支撑非平行墙体间施工缝处的内侧模板、提高施工效率的效果。
Construction joint formwork supporting system and construction method thereof
施工缝模板支撑系统及其施工方法
WANG GUOHUA (author) / TANG GENRONG (author) / ZENG JIHONG (author)
2021-06-11
Patent
Electronic Resource
Chinese
Formwork supporting system and construction method thereof
European Patent Office | 2021
|Deformation joint shear wall formwork structure and formwork supporting construction method
European Patent Office | 2024
|Climbing formwork system, construction method thereof and climbing formwork supporting device
European Patent Office | 2020
|Fabricated supporting formwork system and construction method thereof
European Patent Office | 2023
|