A platform for research: civil engineering, architecture and urbanism
Bracket supporting structure for capping beam construction and capping beam construction method
The invention discloses a bracket supporting structure for capping beam construction. The bracket supporting structure comprises a cross beam, a bracket supporting beam, a pair of brackets and a circumferential positioning hoop. The invention further discloses a capping beam construction method which comprises the following steps that: S1, the cross beam is fixed to the end face of the top end of the pier column, the pair of corbels is hung at the two ends of the cross beam, then the circumferential positioning hoop is connected with the pair of corbels, the pair of corbels are fixed in the circumferential direction of the pier column through the circumferential positioning hoop, and finally the support supporting beam is erected on the corbels; S2, a support is erected upwards with the support supporting beam as a starting point, and capping beam pouring construction is completed; during pouring construction of the cover beam, the cross beam is poured in the cover beam; and S3, after pouring construction of the cover beam is completed, the hanging piece exposed out of the cover beam is cut off, and the support, the bracket supporting beam, the circumferential positioning hoop and the bracket are dismantled. The potential safety hazard that the support slides down can be eliminated, the bracket is convenient to disassemble, and the construction period is shortened.
本发明公开了一种盖梁施工的支架支撑结构,包括横梁、支架支撑梁和一对牛腿,以及周向定位抱箍。本发明还公开了盖梁施工方法,包括以下步骤,S1:将横梁固定于墩柱顶端端面,将一对牛腿吊挂于该横梁的两端,再将周向定位抱箍与该对牛腿连接,利用该周向定位抱箍沿该墩柱周向固定该对牛腿,最后将支架支撑梁架设于该牛腿;S2:以支架支撑梁为起点向上搭建支架,并完成盖梁浇筑施工;在盖梁浇筑施工时,将横梁浇筑于盖梁内;S3:盖梁浇筑施工完成后,切断外露于该盖梁的吊挂件,拆除支架、支架支撑梁、周向定位抱箍和牛腿。本发明能够消除支架下滑的安全隐患,而且便于拆卸支架,有利于施工工期的缩短。
Bracket supporting structure for capping beam construction and capping beam construction method
The invention discloses a bracket supporting structure for capping beam construction. The bracket supporting structure comprises a cross beam, a bracket supporting beam, a pair of brackets and a circumferential positioning hoop. The invention further discloses a capping beam construction method which comprises the following steps that: S1, the cross beam is fixed to the end face of the top end of the pier column, the pair of corbels is hung at the two ends of the cross beam, then the circumferential positioning hoop is connected with the pair of corbels, the pair of corbels are fixed in the circumferential direction of the pier column through the circumferential positioning hoop, and finally the support supporting beam is erected on the corbels; S2, a support is erected upwards with the support supporting beam as a starting point, and capping beam pouring construction is completed; during pouring construction of the cover beam, the cross beam is poured in the cover beam; and S3, after pouring construction of the cover beam is completed, the hanging piece exposed out of the cover beam is cut off, and the support, the bracket supporting beam, the circumferential positioning hoop and the bracket are dismantled. The potential safety hazard that the support slides down can be eliminated, the bracket is convenient to disassemble, and the construction period is shortened.
本发明公开了一种盖梁施工的支架支撑结构,包括横梁、支架支撑梁和一对牛腿,以及周向定位抱箍。本发明还公开了盖梁施工方法,包括以下步骤,S1:将横梁固定于墩柱顶端端面,将一对牛腿吊挂于该横梁的两端,再将周向定位抱箍与该对牛腿连接,利用该周向定位抱箍沿该墩柱周向固定该对牛腿,最后将支架支撑梁架设于该牛腿;S2:以支架支撑梁为起点向上搭建支架,并完成盖梁浇筑施工;在盖梁浇筑施工时,将横梁浇筑于盖梁内;S3:盖梁浇筑施工完成后,切断外露于该盖梁的吊挂件,拆除支架、支架支撑梁、周向定位抱箍和牛腿。本发明能够消除支架下滑的安全隐患,而且便于拆卸支架,有利于施工工期的缩短。
Bracket supporting structure for capping beam construction and capping beam construction method
盖梁施工的支架支撑结构及盖梁施工方法
XIAO YITAO (author) / HE TENG (author) / ZHAO JIESHENG (author) / LUO HONG (author) / WANG QUANJUN (author) / HU LEI (author) / LI HAI'OU (author)
2021-06-15
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Layered capping beam construction measure and layered capping beam construction method
European Patent Office | 2023
|Bridge capping beam construction system and construction method thereof