Underground comprehensive pipe gallery pouring formwork system
The invention discloses an underground comprehensive pipe gallery pouring formwork system. The underground comprehensive pipe gallery pouring formwork system comprises a bin inner formwork and a bin outer formwork which are used for pipe gallery concrete pouring lining; the bin outer formwork is hoisted and moved through a crane and is matched with the bin inner formwork after being fixed to achieve concrete pouring; and the bin inner formwork comprises at least two sets of formwork combinations, and the two sets of formwork combinations can be loaded and moved through a trolley to penetrate through each other to achieve alternate and continuous concrete pouring and equal-strength construction. According to the system, a variable formwork combination structure is adopted, the formwork combinations are carried and moved through the trolley, pouring and demolding are supported, the formwork combinations penetrate through the formwork combinations to be poured after demolding is achieved through a folding or telescopic structure, and alternate and continuous concrete pouring lining construction is achieved. By means of the system, the concrete lining quality can be improved, and the size, precision, appearance and quality of a concrete pouring body are higher; meanwhile, the problems that the labor intensity of workers is large, the labor cost is high, and mechanical equipment such as a large-tonnage crane needs to be arranged at any time are solved; and the overall construction efficiency is improved.
本发明公开了一种地下综合管廊浇筑模板系统。包括用于管廊混凝土浇筑衬砌的仓内模板和仓外模板,仓外模板由行车吊运移动,固定后与仓内模板配合实现混凝土浇筑;仓内模板包括至少两套模板组合,两套模板组合均可由台车负载移动相互穿行实现交替连续的混凝土浇筑和等强施工。本发明系统采用可变模板组合结构,将模板组合通过台车运载移动、支撑浇筑和脱模,采用折叠或伸缩结构实现脱模后穿过待浇筑模板组合,实现交替、连续的混凝土浇筑衬砌施工;系统能够提高混凝土的衬砌质量,使混凝土浇筑体的尺寸、精度、外观、质量更高;同时解决了工作人员劳动强度大,人工成本高,需随时配备大吨位吊车等机械设备的问题;提高了整体施工效率。
Underground comprehensive pipe gallery pouring formwork system
The invention discloses an underground comprehensive pipe gallery pouring formwork system. The underground comprehensive pipe gallery pouring formwork system comprises a bin inner formwork and a bin outer formwork which are used for pipe gallery concrete pouring lining; the bin outer formwork is hoisted and moved through a crane and is matched with the bin inner formwork after being fixed to achieve concrete pouring; and the bin inner formwork comprises at least two sets of formwork combinations, and the two sets of formwork combinations can be loaded and moved through a trolley to penetrate through each other to achieve alternate and continuous concrete pouring and equal-strength construction. According to the system, a variable formwork combination structure is adopted, the formwork combinations are carried and moved through the trolley, pouring and demolding are supported, the formwork combinations penetrate through the formwork combinations to be poured after demolding is achieved through a folding or telescopic structure, and alternate and continuous concrete pouring lining construction is achieved. By means of the system, the concrete lining quality can be improved, and the size, precision, appearance and quality of a concrete pouring body are higher; meanwhile, the problems that the labor intensity of workers is large, the labor cost is high, and mechanical equipment such as a large-tonnage crane needs to be arranged at any time are solved; and the overall construction efficiency is improved.
本发明公开了一种地下综合管廊浇筑模板系统。包括用于管廊混凝土浇筑衬砌的仓内模板和仓外模板,仓外模板由行车吊运移动,固定后与仓内模板配合实现混凝土浇筑;仓内模板包括至少两套模板组合,两套模板组合均可由台车负载移动相互穿行实现交替连续的混凝土浇筑和等强施工。本发明系统采用可变模板组合结构,将模板组合通过台车运载移动、支撑浇筑和脱模,采用折叠或伸缩结构实现脱模后穿过待浇筑模板组合,实现交替、连续的混凝土浇筑衬砌施工;系统能够提高混凝土的衬砌质量,使混凝土浇筑体的尺寸、精度、外观、质量更高;同时解决了工作人员劳动强度大,人工成本高,需随时配备大吨位吊车等机械设备的问题;提高了整体施工效率。
Underground comprehensive pipe gallery pouring formwork system
一种地下综合管廊浇筑模板系统
LI CHUNQUAN (author) / XIE WEI (author) / XIANG JIAN (author) / HOU HEPING (author) / WEI PING (author) / KONG YUNZHOU (author) / HEI XUHAO (author) / WANG TAO (author) / LIU KE (author) / SHEN YULAN (author)
2021-06-22
Patent
Electronic Resource
Chinese
Manufacturing method of vertical prefabricated formwork of underground comprehensive pipe gallery
European Patent Office | 2020
|Auxiliary climbing formwork system for underground pipe gallery construction
European Patent Office | 2020
European Patent Office | 2022
|Outer side formwork and formwork system for comprehensive pipe gallery construction
European Patent Office | 2024
|