A platform for research: civil engineering, architecture and urbanism
Underground comprehensive pipe gallery construction joint position formwork fixing structure and method
The underground comprehensive pipe gallery construction joint position formwork fixing structure comprises film-covered bamboo glue formworks, the film-covered bamboo glue formworks are installed on the two sides of a pouring area, a plurality of locking rods are arranged on the film-covered bamboo glue formworks in a penetrating mode, the pre-buried ends of the locking rods are bent by 90 degrees, the pre-buried ends of the locking rods stretch into the pouring area and are connected with main reinforcements in a hooked mode, and the main reinforcements are connected with the film-covered bamboo glue formworks. And a limiting nut is arranged on the locking rod on the outer side of the film-coated bamboo glue template. By the adoption of the structure, the problems that a traditional formwork fixing method is low in construction efficiency, poor in fixing effect and high in cost input are solved, and the problem that split bolts are inconvenient to arrange due to the water stop steel plate at the pipe gallery construction joint position is solved.
一种地下综合管廊施工缝位置模板固定结构,包括覆膜竹胶模板,所述的覆膜竹胶模板安装于浇筑区域两侧,覆膜竹胶模板上穿设有多根锁杆,锁杆预埋端呈90°弯角,锁杆的预埋端伸入浇筑区域内并与主筋钩接,在位于覆膜竹胶模板外侧的锁杆上设有限位螺母。本发明专利采用上述结构,用以解决传统模板固定方法施工效率低、固定效果差及成本投入高的问题,并解决了管廊施工缝位置因止水钢板所造成的对拉螺栓设置不便问题。
Underground comprehensive pipe gallery construction joint position formwork fixing structure and method
The underground comprehensive pipe gallery construction joint position formwork fixing structure comprises film-covered bamboo glue formworks, the film-covered bamboo glue formworks are installed on the two sides of a pouring area, a plurality of locking rods are arranged on the film-covered bamboo glue formworks in a penetrating mode, the pre-buried ends of the locking rods are bent by 90 degrees, the pre-buried ends of the locking rods stretch into the pouring area and are connected with main reinforcements in a hooked mode, and the main reinforcements are connected with the film-covered bamboo glue formworks. And a limiting nut is arranged on the locking rod on the outer side of the film-coated bamboo glue template. By the adoption of the structure, the problems that a traditional formwork fixing method is low in construction efficiency, poor in fixing effect and high in cost input are solved, and the problem that split bolts are inconvenient to arrange due to the water stop steel plate at the pipe gallery construction joint position is solved.
一种地下综合管廊施工缝位置模板固定结构,包括覆膜竹胶模板,所述的覆膜竹胶模板安装于浇筑区域两侧,覆膜竹胶模板上穿设有多根锁杆,锁杆预埋端呈90°弯角,锁杆的预埋端伸入浇筑区域内并与主筋钩接,在位于覆膜竹胶模板外侧的锁杆上设有限位螺母。本发明专利采用上述结构,用以解决传统模板固定方法施工效率低、固定效果差及成本投入高的问题,并解决了管廊施工缝位置因止水钢板所造成的对拉螺栓设置不便问题。
Underground comprehensive pipe gallery construction joint position formwork fixing structure and method
地下综合管廊施工缝位置模板固定结构及方法
MA RONGZENG (author) / WANG YANG (author) / YE JUNXIONG (author) / FANG JINQIU (author) / ZHU XUNYUE (author) / TAO CHENGPIN (author) / WANG RUCHENG (author) / LYU LIMENG (author) / LIU JIANYONG (author) / LYU ERYAN (author)
2022-11-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground comprehensive pipe gallery pouring formwork system
European Patent Office | 2021
|European Patent Office | 2022
|Auxiliary climbing formwork system for underground pipe gallery construction
European Patent Office | 2020
Comprehensive pipe gallery hydraulic formwork trolley and construction method
European Patent Office | 2023
|Outer side formwork and formwork system for comprehensive pipe gallery construction
European Patent Office | 2024
|