A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of roadbed filling, in particular to a roadbed filling system based on earthwork engineering and a filling method thereof. The roadbed filling system comprises a compaction device, the left side of the compaction device is fixedly connected with a movable shell, and a discharging hopper is fixedly connected into a through opening formed in the right side of the top of the movable shell. The compaction device, the smashing system and the linkage material distributing mechanism are used in cooperation, the compaction device can compact the pavement during moving, the smashing system sorts raw materials for paving the pavement, the raw materials are divided into coarse particles, medium particles and gravel, the coarse particles, the medium particles and the gravel are sorted, and under linkage of the linkage material distributing mechanism, the raw materials are compacted and compacted through the linkage material distributing mechanism, medium-particle stones are laid on coarse particles, and gravel is laid on the medium particles, so that all the laying procedures can be completed at a time and do not need to be carried out separately, the laid raw materials can be preferably distinguished, the pavement laying quality is improved, and the problem that holes appear after coarse particles are laid is solved.
本发明涉及路基填筑技术领域,具体为一种基于土石方工程中的路基填筑系统及其填筑方法,包括:压实装置,所述压实装置的左侧固定连接有移动外壳,所述移动外壳的顶部右侧开设的通口内固定连接下料斗。本发明通过将压实装置、粉碎系统和联动分料机构相互配合使用,压实装置能够在移动时对路面进行压实,粉碎系统将铺设路面的原料进行分选,将原料分为粗颗粒,中颗粒以及砂石分选开,并经过联动分料机构的联动下,经过联动分料机构将其夯实和压实,中颗粒的石块铺设与粗颗粒上,砂石铺设在中颗粒上,从而能够一次性完成所有铺设的工序,无需分开进行,而且能够将铺设的原料进行优选区分,增加了路面的铺设的质量,不会出现粗颗粒铺设后出现空穴的问题。
The invention relates to the technical field of roadbed filling, in particular to a roadbed filling system based on earthwork engineering and a filling method thereof. The roadbed filling system comprises a compaction device, the left side of the compaction device is fixedly connected with a movable shell, and a discharging hopper is fixedly connected into a through opening formed in the right side of the top of the movable shell. The compaction device, the smashing system and the linkage material distributing mechanism are used in cooperation, the compaction device can compact the pavement during moving, the smashing system sorts raw materials for paving the pavement, the raw materials are divided into coarse particles, medium particles and gravel, the coarse particles, the medium particles and the gravel are sorted, and under linkage of the linkage material distributing mechanism, the raw materials are compacted and compacted through the linkage material distributing mechanism, medium-particle stones are laid on coarse particles, and gravel is laid on the medium particles, so that all the laying procedures can be completed at a time and do not need to be carried out separately, the laid raw materials can be preferably distinguished, the pavement laying quality is improved, and the problem that holes appear after coarse particles are laid is solved.
本发明涉及路基填筑技术领域,具体为一种基于土石方工程中的路基填筑系统及其填筑方法,包括:压实装置,所述压实装置的左侧固定连接有移动外壳,所述移动外壳的顶部右侧开设的通口内固定连接下料斗。本发明通过将压实装置、粉碎系统和联动分料机构相互配合使用,压实装置能够在移动时对路面进行压实,粉碎系统将铺设路面的原料进行分选,将原料分为粗颗粒,中颗粒以及砂石分选开,并经过联动分料机构的联动下,经过联动分料机构将其夯实和压实,中颗粒的石块铺设与粗颗粒上,砂石铺设在中颗粒上,从而能够一次性完成所有铺设的工序,无需分开进行,而且能够将铺设的原料进行优选区分,增加了路面的铺设的质量,不会出现粗颗粒铺设后出现空穴的问题。
Roadbed filling system based on earth-rock engineering and filling method thereof
一种基于土石方工程中的路基填筑系统及其填筑方法
LIU FANG (author)
2021-06-25
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Roadbed filling and foundation pit backfilling in earth-rock engineering and using method thereof
European Patent Office | 2021
|