A platform for research: civil engineering, architecture and urbanism
Wind power single pile sludge in-situ solidification construction process
The invention provides a wind power single pile sludge in-situ solidification construction process. The wind power single pile sludge in-situ solidification construction process comprises the steps of positioning a solidification ship in a construction area; constructing a sludge in-situ solidification structure on a single pile; and continuing to construct the sludge in-situ solidification structure of the subsequent single pile after the solidification ship moves for a certain distance. According to the wind power single pile sludge in-situ solidification construction process, solidification equipment and a solidification device are used on the solidification ship, and concrete to which curing agents are added is injected into a certain depth below an existing shoal surface around the single pile in the form of a solidified pile and is fully stirred, so that the curing agents and soil around the wind power single pile are fully fused, and scouring is prevented under the action of the solidified pile.
本发明提供了一种风电单桩淤泥原位固化施工工艺,包括:在施工区定位固化船;对单桩进行淤泥原位固化结构施工;固化船移动一段距离继续进行后续单桩的淤泥原位固化结构施工。本发明在固化船上利用固化设备和固化装置,将添加有固化剂的混凝土以固化桩的形式注入单桩周围已有的海涂面以下一定深度,并充分搅拌,使固化剂与风电单桩周围泥土充分融合,在固化桩作用下防止冲刷。
Wind power single pile sludge in-situ solidification construction process
The invention provides a wind power single pile sludge in-situ solidification construction process. The wind power single pile sludge in-situ solidification construction process comprises the steps of positioning a solidification ship in a construction area; constructing a sludge in-situ solidification structure on a single pile; and continuing to construct the sludge in-situ solidification structure of the subsequent single pile after the solidification ship moves for a certain distance. According to the wind power single pile sludge in-situ solidification construction process, solidification equipment and a solidification device are used on the solidification ship, and concrete to which curing agents are added is injected into a certain depth below an existing shoal surface around the single pile in the form of a solidified pile and is fully stirred, so that the curing agents and soil around the wind power single pile are fully fused, and scouring is prevented under the action of the solidified pile.
本发明提供了一种风电单桩淤泥原位固化施工工艺,包括:在施工区定位固化船;对单桩进行淤泥原位固化结构施工;固化船移动一段距离继续进行后续单桩的淤泥原位固化结构施工。本发明在固化船上利用固化设备和固化装置,将添加有固化剂的混凝土以固化桩的形式注入单桩周围已有的海涂面以下一定深度,并充分搅拌,使固化剂与风电单桩周围泥土充分融合,在固化桩作用下防止冲刷。
Wind power single pile sludge in-situ solidification construction process
一种风电单桩淤泥原位固化施工工艺
LI JUNLAI (author) / GUAN PENGCHENG (author) / HUANG YONGMING (author) / YU AGANG (author) / LI NAN (author) / GE JIONG (author) / YIN JIANFENG (author) / LIU FUYONG (author) / YANG ZHIMING (author) / WU WEIWEI (author)
2021-07-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Sludge solidification energy pile structure and construction method thereof
European Patent Office | 2023
|Wind power single pile, pile sinking construction device and pile sinking construction method
European Patent Office | 2024
|Construction method for anti-scouring solidification structure around offshore wind power pile
European Patent Office | 2023
|Pile gripper for offshore wind power single pile foundation construction
European Patent Office | 2024
|Single pile construction process and self-elevating wind power installation platform
European Patent Office | 2021
|