A platform for research: civil engineering, architecture and urbanism
Sludge solidification energy pile structure and construction method thereof
The invention discloses a sludge solidification energy pile structure and a construction method thereof. The sludge solidification energy pile structure comprises a framework, a heat conduction pipe is fixedly installed in the framework, the framework is filled with filler, and pile planting holes are filled with the filler; the heat conduction pipe comprises a spiral water inlet pipe and a spiral water outlet pipe, the spiral outer wall of the water inlet pipe and the inner wall of the framework are fixedly mounted, the bottom end of the water inlet pipe is communicated with the bottom end of the water outlet pipe, the water outlet pipe is located in the spiral center of the water inlet pipe, and the filler abuts against the outer walls of the water inlet pipe and the water outlet pipe; the top ends in the water inlet pipe and the water outlet pipe respectively extend out of the filler. A new way is provided for resource utilization of the waste mud, the limitation of original stirring method construction is broken through, the uniformity and controllability of the pile body quality are achieved, and the pile forming process is more efficient, more convenient, more energy-saving and more environment-friendly.
本发明公开一种淤泥固化能源桩结构及其施工方法,包括骨架,骨架内固定安装有导热管,骨架内填充有填料,填料填满植桩孔;导热管包括进水管和出水管,进水管呈螺旋型,螺旋型的外壁与骨架内壁固定安装,进水管的底端与出水管的底端连通,出水管位于进水管螺旋型的中心,填料与进水管和出水管的外壁抵接;进水管和出水管内的顶端分别伸出填料。本发明为废弃泥的资源化利用提供新的途径,突破原搅拌法施工的局限性,实现桩身质量的均匀性、可控性,成桩工艺更加高效便捷、节能环保。
Sludge solidification energy pile structure and construction method thereof
The invention discloses a sludge solidification energy pile structure and a construction method thereof. The sludge solidification energy pile structure comprises a framework, a heat conduction pipe is fixedly installed in the framework, the framework is filled with filler, and pile planting holes are filled with the filler; the heat conduction pipe comprises a spiral water inlet pipe and a spiral water outlet pipe, the spiral outer wall of the water inlet pipe and the inner wall of the framework are fixedly mounted, the bottom end of the water inlet pipe is communicated with the bottom end of the water outlet pipe, the water outlet pipe is located in the spiral center of the water inlet pipe, and the filler abuts against the outer walls of the water inlet pipe and the water outlet pipe; the top ends in the water inlet pipe and the water outlet pipe respectively extend out of the filler. A new way is provided for resource utilization of the waste mud, the limitation of original stirring method construction is broken through, the uniformity and controllability of the pile body quality are achieved, and the pile forming process is more efficient, more convenient, more energy-saving and more environment-friendly.
本发明公开一种淤泥固化能源桩结构及其施工方法,包括骨架,骨架内固定安装有导热管,骨架内填充有填料,填料填满植桩孔;导热管包括进水管和出水管,进水管呈螺旋型,螺旋型的外壁与骨架内壁固定安装,进水管的底端与出水管的底端连通,出水管位于进水管螺旋型的中心,填料与进水管和出水管的外壁抵接;进水管和出水管内的顶端分别伸出填料。本发明为废弃泥的资源化利用提供新的途径,突破原搅拌法施工的局限性,实现桩身质量的均匀性、可控性,成桩工艺更加高效便捷、节能环保。
Sludge solidification energy pile structure and construction method thereof
一种淤泥固化能源桩结构及其施工方法
LIU ZHENJIAN (author) / XU GUIZHONG (author) / QIU CHENGCHUN (author) / GU GUOQING (author) / SONG MIAOMIAO (author) / ZHANG DAN (author) / DONG YAWEI (author) / SU YING (author) / ZHANG JINGHONG (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
F24T
GEOTHERMAL COLLECTORS
,
Erdwärmekollektoren
/
F28D
Wärmetauscher, soweit in keiner anderen Unterklasse vorgesehen, in denen die Wärmetauschmittel nicht in direkte Berührung miteinander kommen
,
HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
Wind power single pile sludge in-situ solidification construction process
European Patent Office | 2021
|Microorganism grouting drainage solidification pile and construction method and application thereof
European Patent Office | 2021
|Sludge solidification agent and sludge solidification method
European Patent Office | 2021
|Mixed sludge solidification construction method forrobot desilting
European Patent Office | 2021
|