Laying method of wide-width waterproof plate for cover and excavation top-down subway station
The invention discloses a laying method of a wide-width waterproof plate for a cover and excavation top-down subway station. The method comprises the following steps of excavating a first-layer soil body, spraying concrete on a first-layer hanging net, performing leveling, pre-burying a bearing part pin hole, calibrating a laying base line, laying a first-layer geotechnical cloth, laying a first-layer waterproof coiled material, installing a bearing component, placing the rest waterproof coiled material, performing cover plate formwork erection, pouring concrete, pouring cover plate concrete, removing a formwork and performing backfilling; and excavating a second-layer soil body, performing leveling, pre-burying a bearing pin hole, calibrating a laying base line, laying a second-layer geotechnical cloth, laying a second-layer waterproof coiled material, installing a bearing component, placing the rest waterproof coiled material, performing middle partition plate and side wall formwork erection, pouring middle partition plate and side wall concrete, removing a formwork, performing bottom plate formwork erection, pouring bottom plate concrete, removing a formwork and the like. By improving the construction steps and using the specially designed waterproof coiled material bearing components, the single-time laying area of the waterproof coiled material is effectively increased, the number of lap joints is reduced, the placement at any time at the stopping moment and the taking at any time at the use moment are achieved, and the construction efficiency is obviously improved.
本发明公开了一种用于盖挖逆作地铁车站的宽幅防水板铺设方法,其包含一层土体开挖,一层挂网喷射混凝土并找平,预埋承托件销孔,标定铺设基线,一层土工布铺设,一层防水卷材铺设,安装承托件,安放剩余防水卷材,盖板支模、浇筑混凝土,盖板混凝土浇筑、拆模,回填;二层土体开挖、找平,预埋承托销孔,标定铺设基线,二层土工布铺设,二层防水卷材铺设,安装承托件,安放剩余防水卷材,中隔板、侧墙支模,中隔板、侧墙混凝土浇筑,拆模,底板支模,底板混凝土浇筑,拆模等步骤。本发明通过改善施工步骤、使用专门设计的防水卷材承托件有效增加防水卷材单次铺设的面积,减少搭接缝的数量,并且可以做到随停随放、随用随取,明显提高了施工效率。
Laying method of wide-width waterproof plate for cover and excavation top-down subway station
The invention discloses a laying method of a wide-width waterproof plate for a cover and excavation top-down subway station. The method comprises the following steps of excavating a first-layer soil body, spraying concrete on a first-layer hanging net, performing leveling, pre-burying a bearing part pin hole, calibrating a laying base line, laying a first-layer geotechnical cloth, laying a first-layer waterproof coiled material, installing a bearing component, placing the rest waterproof coiled material, performing cover plate formwork erection, pouring concrete, pouring cover plate concrete, removing a formwork and performing backfilling; and excavating a second-layer soil body, performing leveling, pre-burying a bearing pin hole, calibrating a laying base line, laying a second-layer geotechnical cloth, laying a second-layer waterproof coiled material, installing a bearing component, placing the rest waterproof coiled material, performing middle partition plate and side wall formwork erection, pouring middle partition plate and side wall concrete, removing a formwork, performing bottom plate formwork erection, pouring bottom plate concrete, removing a formwork and the like. By improving the construction steps and using the specially designed waterproof coiled material bearing components, the single-time laying area of the waterproof coiled material is effectively increased, the number of lap joints is reduced, the placement at any time at the stopping moment and the taking at any time at the use moment are achieved, and the construction efficiency is obviously improved.
本发明公开了一种用于盖挖逆作地铁车站的宽幅防水板铺设方法,其包含一层土体开挖,一层挂网喷射混凝土并找平,预埋承托件销孔,标定铺设基线,一层土工布铺设,一层防水卷材铺设,安装承托件,安放剩余防水卷材,盖板支模、浇筑混凝土,盖板混凝土浇筑、拆模,回填;二层土体开挖、找平,预埋承托销孔,标定铺设基线,二层土工布铺设,二层防水卷材铺设,安装承托件,安放剩余防水卷材,中隔板、侧墙支模,中隔板、侧墙混凝土浇筑,拆模,底板支模,底板混凝土浇筑,拆模等步骤。本发明通过改善施工步骤、使用专门设计的防水卷材承托件有效增加防水卷材单次铺设的面积,减少搭接缝的数量,并且可以做到随停随放、随用随取,明显提高了施工效率。
Laying method of wide-width waterproof plate for cover and excavation top-down subway station
一种用于盖挖逆作地铁车站的宽幅防水板铺设方法
LI XIAOLONG (author) / DONG FEI (author) / XIE TIANHAO (author) / ZHOU YUMEI (author) / WU YUEHUA (author) / ZHENG LI (author) / YAO GUANG (author) / CHEN XIAOTONG (author) / LUO XUENIAN (author) / CHEN FUCHENG (author)
2021-07-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Subway station cover and excavation top-down structure and construction method
European Patent Office | 2023
|Plate-first and wall-second construction method of cover and excavation top-down subway station
European Patent Office | 2023
|Subway station cover and excavation top-down structure and construction method thereof
European Patent Office | 2021
|European Patent Office | 2021
|