A platform for research: civil engineering, architecture and urbanism
Construction and mounting method of concrete prefabricated column
The invention provides a construction and mounting method of a concrete prefabricated column. The construction and mounting method of the concrete prefabricated column comprises the steps of cup opening foundation machining and concrete prefabricated column machining. The concrete prefabricated column machining comprises the steps of step 1, machining the concrete prefabricated column in a horizontal placement mode; Step 2, delimiting an axis and an elevation line; Step 3, remeasuring and cleaning the bottom elevation of the cup opening; Step 4, demolding and flanging the concrete prefabricated column; Step 5, hoisting the concrete prefabricated column; Step 6, inserting the concrete prefabricated column; and Step 7, pouring concrete into the cup opening, so that mounting of the concrete prefabricated column is completed. Compared with the prior art, the construction and mounting method of the concrete prefabricated column has the advantages that the construction efficiency of the concrete prefabricated column is effectively improved, the construction sequence of all the steps is defined, and the mounting of a crane beam is facilitated.
本发明提供一种混凝土预制柱的施工及安装方法。所述混凝土预制柱的施工及安装方法包括杯口基础加工和混凝土预制柱加工;所述混凝土预制柱加工包括:步骤一,采用平放的方式加工混凝土预制柱;步骤二,划定轴线与标高线;步骤三,杯口底标高复测与清理;步骤四,混凝土预制柱脱模与翻边;步骤五,混凝土预制柱吊装;步骤六,混凝土预制柱插装;步骤七,在杯口内浇筑混凝土;完成混凝土预制柱的安装。与相关技术相比,本发明提供的混凝土预制柱的施工及安装方法有效地提高了混凝土预制柱施工效率;明确了各步骤间的施工顺序;利于行车梁的安装。
Construction and mounting method of concrete prefabricated column
The invention provides a construction and mounting method of a concrete prefabricated column. The construction and mounting method of the concrete prefabricated column comprises the steps of cup opening foundation machining and concrete prefabricated column machining. The concrete prefabricated column machining comprises the steps of step 1, machining the concrete prefabricated column in a horizontal placement mode; Step 2, delimiting an axis and an elevation line; Step 3, remeasuring and cleaning the bottom elevation of the cup opening; Step 4, demolding and flanging the concrete prefabricated column; Step 5, hoisting the concrete prefabricated column; Step 6, inserting the concrete prefabricated column; and Step 7, pouring concrete into the cup opening, so that mounting of the concrete prefabricated column is completed. Compared with the prior art, the construction and mounting method of the concrete prefabricated column has the advantages that the construction efficiency of the concrete prefabricated column is effectively improved, the construction sequence of all the steps is defined, and the mounting of a crane beam is facilitated.
本发明提供一种混凝土预制柱的施工及安装方法。所述混凝土预制柱的施工及安装方法包括杯口基础加工和混凝土预制柱加工;所述混凝土预制柱加工包括:步骤一,采用平放的方式加工混凝土预制柱;步骤二,划定轴线与标高线;步骤三,杯口底标高复测与清理;步骤四,混凝土预制柱脱模与翻边;步骤五,混凝土预制柱吊装;步骤六,混凝土预制柱插装;步骤七,在杯口内浇筑混凝土;完成混凝土预制柱的安装。与相关技术相比,本发明提供的混凝土预制柱的施工及安装方法有效地提高了混凝土预制柱施工效率;明确了各步骤间的施工顺序;利于行车梁的安装。
Construction and mounting method of concrete prefabricated column
一种混凝土预制柱的施工及安装方法
WANG QINGQUAN (author) / WANG XINHUI (author) / LI YINGHUA (author) / LI JIAN (author)
2021-07-30
Patent
Electronic Resource
Chinese
Novel prefabricated concrete frame column and mounting method
European Patent Office | 2020
|Fabricated concrete prefabricated column construction method
European Patent Office | 2024
|Cup foundation concrete prefabricated column mounting device and method
European Patent Office | 2024
|European Patent Office | 2023
|