Mounting method of prefabricated column
The invention relates to an installation method of a prefabricated column. The installation method comprises the steps that a combination surface on an installation foundation is cleaned and scabbled; straightening and correcting all the reserved steel bars in the junction surface; paying off the axes of all the reserved steel bars on the top surface of the mounting foundation to form first reserved steel bar axes, wherein the first reserved steel bar axes correspond to the reserved steel bars one to one; paying off the axes of all the sleeves at the bottom of the prefabricated column on the side wall, close to one side of the corresponding sleeve, of the prefabricated column to form sleeve axes, wherein the sleeve axes correspond to the sleeves one to one; the prefabricated column is hoisted to the position over the combination face, and the position of the prefabricated column is adjusted till the axis of each sleeve perpendicularly intersects with the axis of the corresponding first reserved steel bar; the prefabricated column is moved downwards, so that the sleeves are arranged on the corresponding reserved steel bars in a sleeving mode; bedding and bin sealing are conducted on the joint of the prefabricated column and the installation foundation in the circumferential direction of the prefabricated column; and the sleeves are filled with slurry to connect the prefabricated column to the mounting foundation, so that the labor cost is saved, the labor intensity is reduced, and the working efficiency is high.
本公开涉及一种预制柱的安装方法,包括清理安装基础上的结合面并对其进行凿毛;调直校正结合面内的所有预留钢筋;在安装基础的顶面上对所有预留钢筋的轴心放线形成第一预留钢筋轴心线,第一预留钢筋轴心线与预留钢筋一一对应;在预制柱靠近对应套筒一侧的侧壁上对预制柱底部的所有套筒的轴心放线形成套筒轴心线,套筒轴心线与套筒一一对应;吊装预制柱至结合面正上方,调整预制柱位置直至每条套筒轴心线均与对应的第一预留钢筋轴心线垂直相交;将预制柱向下移动使各套筒套设在对应的预留钢筋上;沿预制柱周向对预制柱和安装基础的结合处坐浆封仓;向各套筒中灌满浆液以将预制柱连接在安装基础上,节省了人工成本,降低了劳动强度,工作效率高。
Mounting method of prefabricated column
The invention relates to an installation method of a prefabricated column. The installation method comprises the steps that a combination surface on an installation foundation is cleaned and scabbled; straightening and correcting all the reserved steel bars in the junction surface; paying off the axes of all the reserved steel bars on the top surface of the mounting foundation to form first reserved steel bar axes, wherein the first reserved steel bar axes correspond to the reserved steel bars one to one; paying off the axes of all the sleeves at the bottom of the prefabricated column on the side wall, close to one side of the corresponding sleeve, of the prefabricated column to form sleeve axes, wherein the sleeve axes correspond to the sleeves one to one; the prefabricated column is hoisted to the position over the combination face, and the position of the prefabricated column is adjusted till the axis of each sleeve perpendicularly intersects with the axis of the corresponding first reserved steel bar; the prefabricated column is moved downwards, so that the sleeves are arranged on the corresponding reserved steel bars in a sleeving mode; bedding and bin sealing are conducted on the joint of the prefabricated column and the installation foundation in the circumferential direction of the prefabricated column; and the sleeves are filled with slurry to connect the prefabricated column to the mounting foundation, so that the labor cost is saved, the labor intensity is reduced, and the working efficiency is high.
本公开涉及一种预制柱的安装方法,包括清理安装基础上的结合面并对其进行凿毛;调直校正结合面内的所有预留钢筋;在安装基础的顶面上对所有预留钢筋的轴心放线形成第一预留钢筋轴心线,第一预留钢筋轴心线与预留钢筋一一对应;在预制柱靠近对应套筒一侧的侧壁上对预制柱底部的所有套筒的轴心放线形成套筒轴心线,套筒轴心线与套筒一一对应;吊装预制柱至结合面正上方,调整预制柱位置直至每条套筒轴心线均与对应的第一预留钢筋轴心线垂直相交;将预制柱向下移动使各套筒套设在对应的预留钢筋上;沿预制柱周向对预制柱和安装基础的结合处坐浆封仓;向各套筒中灌满浆液以将预制柱连接在安装基础上,节省了人工成本,降低了劳动强度,工作效率高。
Mounting method of prefabricated column
预制柱的安装方法
WU WEI (author) / ZHANG HONGMING (author) / BAI JUNMING (author) / TANG RONG (author) / HUANG MEIYANG (author)
2023-10-20
Patent
Electronic Resource
Chinese
Novel prefabricated concrete frame column and mounting method
European Patent Office | 2020
|Construction and mounting method of concrete prefabricated column
European Patent Office | 2021
|Cup foundation concrete prefabricated column mounting device and method
European Patent Office | 2024
|