Paving construction method for cement-stabilized gravel base
The invention is applicable to the technical field of road paving construction, and provides a paving construction method for a cement-stabilized gravel base. The method comprises the following steps: pretreating the gravel base layer, and checking and accepting after the pretreatment is completed; carrying out survey lofting along the gravel base layer; preparing a cement mixture according to the environment; paving the cement mixture on the gravel base layer according to a preset speed, and rolling after the cement mixture is paved to a preset distance to form a lower base layer; paving the cement mixture on the lower base layer according to the preset speed within a preset time, and rolling after the cement mixture is paved to the preset distance to form an upper base layer; and covering the upper base layer with geotechnical cloth, and performing watering maintenance on the upper base layer at intervals, wherein the maintenance time is at least seven days. The whole construction process is compact in connection, the construction period is short, the labor intensity is low, and the stability is high.
本发明适用于道路摊铺施工技术领域,提供了一种水泥稳定砂砾基层的摊铺施工方法,包括步骤:对砂砾基层进行预处理,并在所述预处理完成后进行验收;沿所述砂砾基层进行测量放样;根据环境配制水泥混合料;将所述水泥混合料根据预设速度摊铺在所述砂砾基层上并在摊铺到预设距离后进行碾压以形成下基层;在预设时间内将所述水泥混合料根据所述预设速度摊铺在所述下基层并在摊铺到所述预设距离后进行碾压以形成上基层;使用土工布覆盖所述上基层,并间隔性对所述上基层进行洒水保养,所述保养的时间至少七天。本发明使整体施工的工序衔接紧凑、施工工期短、人工强度低、且稳定性高。
Paving construction method for cement-stabilized gravel base
The invention is applicable to the technical field of road paving construction, and provides a paving construction method for a cement-stabilized gravel base. The method comprises the following steps: pretreating the gravel base layer, and checking and accepting after the pretreatment is completed; carrying out survey lofting along the gravel base layer; preparing a cement mixture according to the environment; paving the cement mixture on the gravel base layer according to a preset speed, and rolling after the cement mixture is paved to a preset distance to form a lower base layer; paving the cement mixture on the lower base layer according to the preset speed within a preset time, and rolling after the cement mixture is paved to the preset distance to form an upper base layer; and covering the upper base layer with geotechnical cloth, and performing watering maintenance on the upper base layer at intervals, wherein the maintenance time is at least seven days. The whole construction process is compact in connection, the construction period is short, the labor intensity is low, and the stability is high.
本发明适用于道路摊铺施工技术领域,提供了一种水泥稳定砂砾基层的摊铺施工方法,包括步骤:对砂砾基层进行预处理,并在所述预处理完成后进行验收;沿所述砂砾基层进行测量放样;根据环境配制水泥混合料;将所述水泥混合料根据预设速度摊铺在所述砂砾基层上并在摊铺到预设距离后进行碾压以形成下基层;在预设时间内将所述水泥混合料根据所述预设速度摊铺在所述下基层并在摊铺到所述预设距离后进行碾压以形成上基层;使用土工布覆盖所述上基层,并间隔性对所述上基层进行洒水保养,所述保养的时间至少七天。本发明使整体施工的工序衔接紧凑、施工工期短、人工强度低、且稳定性高。
Paving construction method for cement-stabilized gravel base
一种水泥稳定砂砾基层的摊铺施工方法
LI YUNPENG (author) / DING RUILIANG (author) / HAN WENYONG (author) / YI ZHONGQIANG (author) / LIANG PUHUA (author) / SUN SHIYU (author) / WANG YAN (author) / AN DONG (author) / XUE WENCHI (author) / HAN JINXIN (author)
2021-08-06
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2023
|Construction paving device for cement stabilized macadam base
European Patent Office | 2024
|European Patent Office | 2023
|Paving and compacting device for cement stabilized macadam base construction
European Patent Office | 2021
|Use of cement-stabilized gravel base
Engineering Index Backfile | 1958
|