Municipal kerb construction method and use method thereof
The invention provides a municipal kerb construction method, and belongs to the technical field of municipal equipment. The municipal kerb construction method solves the problems that in the driving operation process of an existing curb slip form machine, workers cannot control the slip form machine to move forwards along a datum line, so that angle deviation is generated between laid curbs and the datum line, the laying attractiveness is affected, the quality of the laid curbs is reduced, the laid curbs still adopt a manual film covering mode, the film covering efficiency is low, and the influence of weather is large. According to the municipal kerb construction method, a working vehicle is included, a motor cavity is defined in the working vehicle, a feeding cavity is defined in the working vehicle and located on the left side of the motor cavity, an electric control box is arranged on the upper end face of the working vehicle, and a feeding hopper is arranged on the left end face of the working vehicle. The municipal kerb construction method is more convenient and stable to use, and the quality of the formed kerb is higher.
本发明提供了一种市政用路缘石施工方法,属于市政装备技术领域。它解决了现有的路缘石滑模机工人在驾驶操作过程中,无法控制滑模机沿基准线前行,导致铺设好的路缘石与基准线间产生角度偏差,不仅影响铺设美观,且降低了铺设成型后的路缘石质量,且铺设后的路缘石依旧采用人工覆膜方式,不仅覆膜效率低,且受天气影响较大的问题。本市政用路缘石施工方法,包括工作车,所述工作车内限定有电机腔,所述工作车内位于所述电机腔左侧限定有送料腔,所述工作车上端面设有电控箱,所述工作车左端面设有进料斗。本市政用路缘石施工方法使用更加方便、稳定,路缘石成形后质量更高。
Municipal kerb construction method and use method thereof
The invention provides a municipal kerb construction method, and belongs to the technical field of municipal equipment. The municipal kerb construction method solves the problems that in the driving operation process of an existing curb slip form machine, workers cannot control the slip form machine to move forwards along a datum line, so that angle deviation is generated between laid curbs and the datum line, the laying attractiveness is affected, the quality of the laid curbs is reduced, the laid curbs still adopt a manual film covering mode, the film covering efficiency is low, and the influence of weather is large. According to the municipal kerb construction method, a working vehicle is included, a motor cavity is defined in the working vehicle, a feeding cavity is defined in the working vehicle and located on the left side of the motor cavity, an electric control box is arranged on the upper end face of the working vehicle, and a feeding hopper is arranged on the left end face of the working vehicle. The municipal kerb construction method is more convenient and stable to use, and the quality of the formed kerb is higher.
本发明提供了一种市政用路缘石施工方法,属于市政装备技术领域。它解决了现有的路缘石滑模机工人在驾驶操作过程中,无法控制滑模机沿基准线前行,导致铺设好的路缘石与基准线间产生角度偏差,不仅影响铺设美观,且降低了铺设成型后的路缘石质量,且铺设后的路缘石依旧采用人工覆膜方式,不仅覆膜效率低,且受天气影响较大的问题。本市政用路缘石施工方法,包括工作车,所述工作车内限定有电机腔,所述工作车内位于所述电机腔左侧限定有送料腔,所述工作车上端面设有电控箱,所述工作车左端面设有进料斗。本市政用路缘石施工方法使用更加方便、稳定,路缘石成形后质量更高。
Municipal kerb construction method and use method thereof
一种市政用路缘石施工方法及其使用方法
YU CHUNLIAN (author)
2021-08-13
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Municipal road kerb prefabrication and installation construction method
European Patent Office | 2022
|PREFABRICATED FORM FOR KERB CONSTRUCTION AND CONSTRUCTION METHOD OF KERB USING THE SAME
European Patent Office | 2018
|