Construction method of permanent and temporary combined box culvert structure
The invention discloses a construction method of a permanent and temporary combined box culvert structure. The construction method comprises the following specific steps: (1) performing manual hole digging (segmented digging) on support piles (1); (2) hoisting a reinforcement cage of the support pile (1); (3) pouring concrete into the support piles (1); (4) installing a D auxiliary beam (2); (5) earth excavation; (6) chiseling off the retaining wall of the middle pile; (7) constructing a box culvert structure; (8) backfilling and tamping; and (9) grouting the backfill area, and dismantling the D auxiliary beam (2). The supporting piles and the box culvert structure are arranged, the supporting piles and the box culvert structure are poured into a whole to jointly bear load, the complexity of dismantling of a temporary structure is avoided, meanwhile, the construction efficiency is effectively improved, the construction cost and interference to the environment are reduced, the structure is simple and compact, and construction is convenient.
本发明公开了一种永临结合箱涵结构的施工方法,具体步骤如下:1)、支护桩(1)人工挖孔(分段开挖);2)、吊放支护桩(1)钢筋笼;3)、浇筑支护桩(1)混凝土;4)、安装D便梁(2);5)、土方开挖;6)、中间桩护壁凿除;7)、箱涵结构施工;8)、回填夯实;9)、回填区注浆,并拆除D便梁(2)。本发明设置支护桩和箱涵结构,并把支护桩和箱涵结构浇筑为一体共同承重,避免了临时结构拆除的繁琐,同时有效提升了施工效率并降低了施工成本以及对环境的干扰,结构简单紧凑,施工便利。
Construction method of permanent and temporary combined box culvert structure
The invention discloses a construction method of a permanent and temporary combined box culvert structure. The construction method comprises the following specific steps: (1) performing manual hole digging (segmented digging) on support piles (1); (2) hoisting a reinforcement cage of the support pile (1); (3) pouring concrete into the support piles (1); (4) installing a D auxiliary beam (2); (5) earth excavation; (6) chiseling off the retaining wall of the middle pile; (7) constructing a box culvert structure; (8) backfilling and tamping; and (9) grouting the backfill area, and dismantling the D auxiliary beam (2). The supporting piles and the box culvert structure are arranged, the supporting piles and the box culvert structure are poured into a whole to jointly bear load, the complexity of dismantling of a temporary structure is avoided, meanwhile, the construction efficiency is effectively improved, the construction cost and interference to the environment are reduced, the structure is simple and compact, and construction is convenient.
本发明公开了一种永临结合箱涵结构的施工方法,具体步骤如下:1)、支护桩(1)人工挖孔(分段开挖);2)、吊放支护桩(1)钢筋笼;3)、浇筑支护桩(1)混凝土;4)、安装D便梁(2);5)、土方开挖;6)、中间桩护壁凿除;7)、箱涵结构施工;8)、回填夯实;9)、回填区注浆,并拆除D便梁(2)。本发明设置支护桩和箱涵结构,并把支护桩和箱涵结构浇筑为一体共同承重,避免了临时结构拆除的繁琐,同时有效提升了施工效率并降低了施工成本以及对环境的干扰,结构简单紧凑,施工便利。
Construction method of permanent and temporary combined box culvert structure
一种永临结合箱涵结构的施工方法
GONG ZHENG (author) / HE HONGXING (author) / WANG SHUFENG (author) / YAN XUECHONG (author) / ZHOU YUE (author)
2021-08-31
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Permanent and temporary combined box culvert foundation reinforcing structure
European Patent Office | 2021
|Permanent and temporary combined multidirectional fixed culvert gate structure
European Patent Office | 2022
|Permanent and temporary combined cofferdam structure and construction method
European Patent Office | 2024
|Box culvert construction method and box culvert structure
European Patent Office | 2024
|