Permanent and temporary combined cofferdam structure and construction method
The invention provides a construction method of a permanent and temporary combined cofferdam structure, which comprises the following steps: firstly, connecting a high steel casing, welding and assembling a bracket, supporting the bracket and a distribution beam on the casing, and mounting a bottom plate and a bottom keel on the distribution beam; then anti-collision pouring jackets are spliced, and pile casing guides and cofferdam inner supports are installed; hanging rods are welded to the bottom plate, a cofferdam lowering system is installed, and the whole cofferdam is lifted; cutting the pile casing at the position below the inner support, lowering the cofferdam below the position of the cross beam, and mounting and hanging the cross beam; the system is converted, and then the cofferdam lowering system is dismantled; then anti-floating corbels are installed, bottom plate plugging plates are installed, and anti-shear steel bars are welded to the pile casings; a first layer of bottom sealing concrete is poured firstly, and then a second layer of bottom sealing concrete is poured; and finally, structural parts are dismantled. The overall structural strength and stability of the cofferdam structure can be guaranteed, the enclosure requirement and the safety requirement during large-size bearing platform construction are met, and the cost input is greatly reduced.
本发明创造提供了一种永临结合的围堰结构的施工方法,先接高钢护筒,在护筒上焊接拼装牛腿、支撑牛腿及分配梁,分配梁上安装底板和底龙骨;然后拼接防撞套箱,安装护筒导向、围堰内支撑;在底板上焊接吊杆,安装围堰下放系统,将围堰整体提升;切割内支撑下方位置护筒,将围堰下放至十字梁位置以下,安装吊挂十字梁;体系转换,然后拆除围堰下放系统;之后安装抗浮牛腿,安装底板封堵板,护筒上焊接抗剪钢筋;先浇筑第一层封底混凝土,再浇筑二层封底混凝土;最后进行结构件拆除。本发明创造能够确保围堰结构的整体结构强度和稳定性,满足大尺寸承台施工时的围护需要和安全要求,大幅减少了成本投入。
Permanent and temporary combined cofferdam structure and construction method
The invention provides a construction method of a permanent and temporary combined cofferdam structure, which comprises the following steps: firstly, connecting a high steel casing, welding and assembling a bracket, supporting the bracket and a distribution beam on the casing, and mounting a bottom plate and a bottom keel on the distribution beam; then anti-collision pouring jackets are spliced, and pile casing guides and cofferdam inner supports are installed; hanging rods are welded to the bottom plate, a cofferdam lowering system is installed, and the whole cofferdam is lifted; cutting the pile casing at the position below the inner support, lowering the cofferdam below the position of the cross beam, and mounting and hanging the cross beam; the system is converted, and then the cofferdam lowering system is dismantled; then anti-floating corbels are installed, bottom plate plugging plates are installed, and anti-shear steel bars are welded to the pile casings; a first layer of bottom sealing concrete is poured firstly, and then a second layer of bottom sealing concrete is poured; and finally, structural parts are dismantled. The overall structural strength and stability of the cofferdam structure can be guaranteed, the enclosure requirement and the safety requirement during large-size bearing platform construction are met, and the cost input is greatly reduced.
本发明创造提供了一种永临结合的围堰结构的施工方法,先接高钢护筒,在护筒上焊接拼装牛腿、支撑牛腿及分配梁,分配梁上安装底板和底龙骨;然后拼接防撞套箱,安装护筒导向、围堰内支撑;在底板上焊接吊杆,安装围堰下放系统,将围堰整体提升;切割内支撑下方位置护筒,将围堰下放至十字梁位置以下,安装吊挂十字梁;体系转换,然后拆除围堰下放系统;之后安装抗浮牛腿,安装底板封堵板,护筒上焊接抗剪钢筋;先浇筑第一层封底混凝土,再浇筑二层封底混凝土;最后进行结构件拆除。本发明创造能够确保围堰结构的整体结构强度和稳定性,满足大尺寸承台施工时的围护需要和安全要求,大幅减少了成本投入。
Permanent and temporary combined cofferdam structure and construction method
一种永临结合的围堰结构及施工方法
DUAN KUANGSHI (author) / XU YIBIN (author) / WANG DIANWEI (author) / ZHU LINDA (author) / XU YONG (author) / TANG HEDA (author) / QI MENG (author) / SHI GUANGYU (author) / YANG HOON (author) / FAN WEI (author)
2024-10-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
European Patent Office | 2022
|TEMPORARY COFFERDAM CONSTRUCTION METHOD AND TEMPORARY COFFERDAM BODY
European Patent Office | 2020
|European Patent Office | 2021
|TEMPORARY COFFERDAM, AND CONSTRUCTION METHOD OF CLOSED TEMPORARY COFFERDAM
European Patent Office | 2021
|Permanent and temporary combined dismantling-free steel cofferdam structure
European Patent Office | 2024
|