A platform for research: civil engineering, architecture and urbanism
Reinforced concrete beam column pouring construction method
The invention relates to a reinforced concrete beam column pouring construction method. The method comprises a workbench, a fixing device, a material containing device and a moving device; the fixing device is arranged at the top of the workbench; and the moving device and the material containing device are sequentially arranged at the top of the fixing device from front to back. According to the reinforced concrete beam column pouring construction method, through the cooperation of the workbench, the fixing device, the material containing device and the moving device, firstly, arranged equipment is moved to a position beside a beam column mold needing concrete pouring, at the moment, the fixing device is adjusted according to beam column molds of different heights, and after the height is adjusted, the material containing device and the moving device are matched, so that concrete is vibrated while the concrete is poured into the beam column mold, and the labor force is greatly reduced.
本发明涉及一种钢筋混凝土梁柱浇筑施工方法,包括工作台、固定装置、盛料装置和移动装置,所述的工作台的顶部设置有固定装置,固定装置的顶部由前至后依次设置有移动装置和盛料装置,本发明通过设置的工作台、固定装置、盛料装置和移动装置的配合,首先将设置的设备移动到需要进行浇注混凝土的梁柱模具旁,此时根据不同高度的梁柱模具进行调节固定装置,当调节好高度之后,利用设置的盛料装置和移动装置的配合,使得实现对梁柱模具进行浇筑混凝土的同时将混凝土进行振捣,从而大大降低了劳动力。
Reinforced concrete beam column pouring construction method
The invention relates to a reinforced concrete beam column pouring construction method. The method comprises a workbench, a fixing device, a material containing device and a moving device; the fixing device is arranged at the top of the workbench; and the moving device and the material containing device are sequentially arranged at the top of the fixing device from front to back. According to the reinforced concrete beam column pouring construction method, through the cooperation of the workbench, the fixing device, the material containing device and the moving device, firstly, arranged equipment is moved to a position beside a beam column mold needing concrete pouring, at the moment, the fixing device is adjusted according to beam column molds of different heights, and after the height is adjusted, the material containing device and the moving device are matched, so that concrete is vibrated while the concrete is poured into the beam column mold, and the labor force is greatly reduced.
本发明涉及一种钢筋混凝土梁柱浇筑施工方法,包括工作台、固定装置、盛料装置和移动装置,所述的工作台的顶部设置有固定装置,固定装置的顶部由前至后依次设置有移动装置和盛料装置,本发明通过设置的工作台、固定装置、盛料装置和移动装置的配合,首先将设置的设备移动到需要进行浇注混凝土的梁柱模具旁,此时根据不同高度的梁柱模具进行调节固定装置,当调节好高度之后,利用设置的盛料装置和移动装置的配合,使得实现对梁柱模具进行浇筑混凝土的同时将混凝土进行振捣,从而大大降低了劳动力。
Reinforced concrete beam column pouring construction method
一种钢筋混凝土梁柱浇筑施工方法
CAO YANPING (author)
2021-08-31
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel reinforced concrete column-beam joint concrete pouring construction method
European Patent Office | 2021
|Concrete column-beam joint one-time pouring forming construction method
European Patent Office | 2023
|