A platform for research: civil engineering, architecture and urbanism
Pile sinking method for steel pipe pile
The invention discloses a pile sinking method for a steel pipe pile in the field of building construction. The pile sinking method for the steel pipe pile aims to improve the pile sinking effect after hammering. The pile sinking method for the steel pipe pile comprises the following steps of S100, integrally hoisting a pile sinking process assembly for the steel pipe pile comprising a process flange; S200, hoisting the pile sinking process assembly for the steel pipe pile on a pile top flange of the steel pipe pile to enable an inner ring part to be in butt joint with the pile top flange; S300, fixedly connecting the inner ring part with the pile top flange, and starting a pile hammer to hammer the process flange; and S400, dismantling the process flange from the pile top flange after hammering is completed. By applying the pile sinking method for the steel pipe pile, the pile sinking effect after hammering can be remarkably improved.
本发明在建筑施工领域,为提高锤击之后的沉桩效果,公开了一种用于钢管桩的沉桩方法,包括如下步骤:S100、将包括工艺法兰在内的用于钢管桩的沉桩工艺组件整体起吊;S200、将用于钢管桩的沉桩工艺组件吊放在钢管桩的桩顶法兰上,使得内环部与桩顶法兰对接;S300、将内环部与桩顶法兰固定连接,启动桩锤,对工艺法兰进行锤击;S400、锤击完成后将工艺法兰从桩顶法兰上拆除;应用上述用于钢管桩的沉桩方法,能够显著提高锤击之后的沉桩效果。
Pile sinking method for steel pipe pile
The invention discloses a pile sinking method for a steel pipe pile in the field of building construction. The pile sinking method for the steel pipe pile aims to improve the pile sinking effect after hammering. The pile sinking method for the steel pipe pile comprises the following steps of S100, integrally hoisting a pile sinking process assembly for the steel pipe pile comprising a process flange; S200, hoisting the pile sinking process assembly for the steel pipe pile on a pile top flange of the steel pipe pile to enable an inner ring part to be in butt joint with the pile top flange; S300, fixedly connecting the inner ring part with the pile top flange, and starting a pile hammer to hammer the process flange; and S400, dismantling the process flange from the pile top flange after hammering is completed. By applying the pile sinking method for the steel pipe pile, the pile sinking effect after hammering can be remarkably improved.
本发明在建筑施工领域,为提高锤击之后的沉桩效果,公开了一种用于钢管桩的沉桩方法,包括如下步骤:S100、将包括工艺法兰在内的用于钢管桩的沉桩工艺组件整体起吊;S200、将用于钢管桩的沉桩工艺组件吊放在钢管桩的桩顶法兰上,使得内环部与桩顶法兰对接;S300、将内环部与桩顶法兰固定连接,启动桩锤,对工艺法兰进行锤击;S400、锤击完成后将工艺法兰从桩顶法兰上拆除;应用上述用于钢管桩的沉桩方法,能够显著提高锤击之后的沉桩效果。
Pile sinking method for steel pipe pile
一种用于钢管桩的沉桩方法
QING QIZHONG (author) / WANG YAOWU (author) / TONG YONGLU (author) / ZHANG XIANG (author) / GUO JIAN (author) / HUANG XUEFENG (author) / JIANG NAN (author) / WEI ZHONGHUA (author)
2021-09-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen