Bridge pier column construction method
A bridge pier column construction method belongs to the technical field of bridge pier construction and comprises the steps that a construction installation site is leveled and compacted through rolling; two symmetrical concrete foundations are poured on the two sides of the installation site, and two reserved notches are formed in the surfaces of the concrete foundations; steel frames are installed in the reserved notches, a plurality of fixing clamping columns of the steel frames are inserted into the preset clamping grooves and are fixedly connected with ground anchor points through cable ropes after being fixed, so that the safety of a construction platform is guaranteed, the height of the standard steel frame (31) is 2 m, and the first pouring height of the pier column body (2) is not larger than 15 m. The construction of the bridge pier column is completed in a matched mode through the construction of the bridge pier column construction device. Constructors can enter and exit the construction platform very conveniently, so that the purposes that the construction platform is reliable in structure and convenient to go up and down are achieved, potential safety hazards are avoided, and the construction efficiency and quality of bridge pier columns are improved.
一种桥梁墩柱施工方法,属于桥墩施工技术领域,包括:将施工安装场地进行平整,碾压密实;在安装场地两侧浇筑两个相对称的混凝土基础,且混凝土基础表开开设两个预留槽口;在预留槽口中安装钢制框架,将多个钢制框架的固定卡柱插进预设卡槽中,固定后通过缆风绳与地面锚点连接固定,以确保施工平台的安全性,标准钢制框架(31)高度为2m,墩柱主体(2)首次浇筑高度不超过15m。通过桥梁墩柱施工装置的搭建,配合完成桥梁墩柱的施工。可使施工人员非常方便地进出施工平台,由此达到了施工平台结构可靠且上下方便的目的,避免了安全隐患,提高桥梁墩柱施工效率和质量。
Bridge pier column construction method
A bridge pier column construction method belongs to the technical field of bridge pier construction and comprises the steps that a construction installation site is leveled and compacted through rolling; two symmetrical concrete foundations are poured on the two sides of the installation site, and two reserved notches are formed in the surfaces of the concrete foundations; steel frames are installed in the reserved notches, a plurality of fixing clamping columns of the steel frames are inserted into the preset clamping grooves and are fixedly connected with ground anchor points through cable ropes after being fixed, so that the safety of a construction platform is guaranteed, the height of the standard steel frame (31) is 2 m, and the first pouring height of the pier column body (2) is not larger than 15 m. The construction of the bridge pier column is completed in a matched mode through the construction of the bridge pier column construction device. Constructors can enter and exit the construction platform very conveniently, so that the purposes that the construction platform is reliable in structure and convenient to go up and down are achieved, potential safety hazards are avoided, and the construction efficiency and quality of bridge pier columns are improved.
一种桥梁墩柱施工方法,属于桥墩施工技术领域,包括:将施工安装场地进行平整,碾压密实;在安装场地两侧浇筑两个相对称的混凝土基础,且混凝土基础表开开设两个预留槽口;在预留槽口中安装钢制框架,将多个钢制框架的固定卡柱插进预设卡槽中,固定后通过缆风绳与地面锚点连接固定,以确保施工平台的安全性,标准钢制框架(31)高度为2m,墩柱主体(2)首次浇筑高度不超过15m。通过桥梁墩柱施工装置的搭建,配合完成桥梁墩柱的施工。可使施工人员非常方便地进出施工平台,由此达到了施工平台结构可靠且上下方便的目的,避免了安全隐患,提高桥梁墩柱施工效率和质量。
Bridge pier column construction method
一种桥梁墩柱施工方法
HE YI (author) / HE NING (author) / ZHANG TAO (author) / HU HUAQING (author) / SHI CHAO (author) / ZHANG SHIXIAN (author) / JIANG XIAOLONG (author) / LIANG ZHIYI (author) / TIAN ZEDONG (author) / HUANG JUNCONG (author)
2024-10-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken