A platform for research: civil engineering, architecture and urbanism
Super high-rise building deep foundation pit and construction method thereof
The invention relates to a super high-rise building deep foundation pit which comprises a foundation pit body. The foundation pit body comprises a pit main body excavated in the ground, first fender posts vertically penetrating into the pit main body along the ground and located at the peripheral side of the pit main body, two circles of second fender posts vertically penetrating into the ground along the peripheral side end of the pit main body, water stop piles vertically penetrating into the ground from the position between the two circles of second fender posts and a steel trestle built at the upper ends of the second fender posts and the water stop piles, and mounting bases for fixing the lower end of the steel trestle are arranged at the upper ends of the water stop piles and the second fender posts. The super high-rise building deep foundation pit and the construction method have the characteristics of convenience in foundation pit construction, convenience in steel trestle building and the like.
本申请涉及一种超高层建筑深基坑,包括基坑本体,所述基坑本体包括开挖于地面的坑体、沿所述地面竖直穿入且位于所述坑体外周侧的第一围护桩、沿所述坑体周侧端竖直穿入地面内的两圈第二围护桩、由两圈所述第二围护桩之间竖直穿入地面内的止水桩以及搭建于所述第二围护桩和所述止水桩上端的钢栈桥,所述止水桩和所述第二围护桩上端设置有供所述钢栈桥下端固定的安装底座。本申请具有方便基坑的施工,方便钢栈桥的搭建等特点。
Super high-rise building deep foundation pit and construction method thereof
The invention relates to a super high-rise building deep foundation pit which comprises a foundation pit body. The foundation pit body comprises a pit main body excavated in the ground, first fender posts vertically penetrating into the pit main body along the ground and located at the peripheral side of the pit main body, two circles of second fender posts vertically penetrating into the ground along the peripheral side end of the pit main body, water stop piles vertically penetrating into the ground from the position between the two circles of second fender posts and a steel trestle built at the upper ends of the second fender posts and the water stop piles, and mounting bases for fixing the lower end of the steel trestle are arranged at the upper ends of the water stop piles and the second fender posts. The super high-rise building deep foundation pit and the construction method have the characteristics of convenience in foundation pit construction, convenience in steel trestle building and the like.
本申请涉及一种超高层建筑深基坑,包括基坑本体,所述基坑本体包括开挖于地面的坑体、沿所述地面竖直穿入且位于所述坑体外周侧的第一围护桩、沿所述坑体周侧端竖直穿入地面内的两圈第二围护桩、由两圈所述第二围护桩之间竖直穿入地面内的止水桩以及搭建于所述第二围护桩和所述止水桩上端的钢栈桥,所述止水桩和所述第二围护桩上端设置有供所述钢栈桥下端固定的安装底座。本申请具有方便基坑的施工,方便钢栈桥的搭建等特点。
Super high-rise building deep foundation pit and construction method thereof
一种超高层建筑深基坑及其施工方法
KANG TING (author) / CHEN YOUBIN (author) / YING ZHIXIA (author) / LOU PEIJI (author) / WEN WEIJIE (author)
2021-09-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Super high-rise building foundation raft construction method
European Patent Office | 2021
|European Patent Office | 2024
|High-rise building foundation pile foundation construction method
European Patent Office | 2021
|Construction method for building in super high-rise deep foundation pit along side and reverse side
European Patent Office | 2024
|