A platform for research: civil engineering, architecture and urbanism
Construction site concrete multi-layer pouring frame and construction method
The invention discloses a construction site concrete multi-layer pouring frame and a construction method. The construction site concrete multi-layer pouring frame comprises a first formwork, a second formwork, a third formwork and a fourth formwork, wherein the inner side surfaces of the first formwork, the second formwork, the third formwork and the fourth formwork are fixedly connected with protective layers, first bottom plates are fixedly connected to the lower surface of the first formwork and the lower surface of the second formwork correspondingly, first grooves are formed in the surfaces of the two first bottom plates correspondingly, and mounting plates are movably connected to the inner sides of the two first grooves correspondingly. According to the construction site concrete multi-layer pouring frame, the fourth formwork and the second formwork can be connected through a supporting frame, stability is improved, a user loosens fourth fastening bolts to detach the supporting frame, operation is easy and convenient, the detaching work efficiency is improved, the sealing performance between two first top plates and two second bottom plates can be improved through sealing gaskets, when concrete is poured, the situation that the concrete is leaked is avoided, the quality of the concrete is reduced, so that the practicability is improved.
本发明公开了一种建筑工地混凝土多层浇筑框架及施工方法,包括第一模板、第二模板、第三模板、第四模板,所述第一模板、第二模板、第三模板、第四模板的内侧表面均固定连接有防护层,所述第一模板与第二模板的下表面均固定连接有第一底板,两个第一底板的表面均开设有第一凹槽,且两个第一凹槽的内侧均活动连接有安装板。本发明支撑架可以将第四模板与第二模板连接起来,提高稳定性,使用者松动第四紧固螺栓,将支撑架拆卸下来,操作简单、便捷,提高了拆卸工作效率,密封垫可以增加两个第一顶板与两个第二底板之间的密封性,避免了在浇灌混凝土时,导致混凝土发生泄漏情况,降低了混凝土质量,从而提高了实用性。
Construction site concrete multi-layer pouring frame and construction method
The invention discloses a construction site concrete multi-layer pouring frame and a construction method. The construction site concrete multi-layer pouring frame comprises a first formwork, a second formwork, a third formwork and a fourth formwork, wherein the inner side surfaces of the first formwork, the second formwork, the third formwork and the fourth formwork are fixedly connected with protective layers, first bottom plates are fixedly connected to the lower surface of the first formwork and the lower surface of the second formwork correspondingly, first grooves are formed in the surfaces of the two first bottom plates correspondingly, and mounting plates are movably connected to the inner sides of the two first grooves correspondingly. According to the construction site concrete multi-layer pouring frame, the fourth formwork and the second formwork can be connected through a supporting frame, stability is improved, a user loosens fourth fastening bolts to detach the supporting frame, operation is easy and convenient, the detaching work efficiency is improved, the sealing performance between two first top plates and two second bottom plates can be improved through sealing gaskets, when concrete is poured, the situation that the concrete is leaked is avoided, the quality of the concrete is reduced, so that the practicability is improved.
本发明公开了一种建筑工地混凝土多层浇筑框架及施工方法,包括第一模板、第二模板、第三模板、第四模板,所述第一模板、第二模板、第三模板、第四模板的内侧表面均固定连接有防护层,所述第一模板与第二模板的下表面均固定连接有第一底板,两个第一底板的表面均开设有第一凹槽,且两个第一凹槽的内侧均活动连接有安装板。本发明支撑架可以将第四模板与第二模板连接起来,提高稳定性,使用者松动第四紧固螺栓,将支撑架拆卸下来,操作简单、便捷,提高了拆卸工作效率,密封垫可以增加两个第一顶板与两个第二底板之间的密封性,避免了在浇灌混凝土时,导致混凝土发生泄漏情况,降低了混凝土质量,从而提高了实用性。
Construction site concrete multi-layer pouring frame and construction method
一种建筑工地混凝土多层浇筑框架及施工方法
WANG HAO (author) / JIA DONGFENG (author)
2021-09-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete pouring equipment for construction site building construction
European Patent Office | 2022
|Construction site concrete pouring monitoring system and method
European Patent Office | 2024
|Construction method of volute layer concrete flat pouring
European Patent Office | 2020
|Construction method for pouring square ditch side wall concrete through movable pouring frame device
European Patent Office | 2023
|