A platform for research: civil engineering, architecture and urbanism
Pile head waterproof treatment structure and construction method
The invention relates to the field of building waterproof construction, in particular to a pile head waterproof treatment structure. The pile head waterproof treatment structure is used for conducting waterproof treatment on a pile body and the connecting position of the pile body and a concrete base layer, steel bars in the pile body penetrate out of the pile body, the waterproof treatment structure comprises a concrete base layer and a waterproof base layer arranged on the portion, located on the outer side of the concrete base layer, of the pile body, and a waterproof layer is laid on the waterproof base layer on the concrete base layer; and the waterproof base layer is made of waterproof materials with permeability and permeates into the concrete base layer and the pile body. The construction method has the effects of improving the construction efficiency of the waterproof structure and reducing the influence on the waterproofness of the waterproof structure.
本申请涉及建筑防水施工的领域,尤其涉及一种桩头防水处理构造,用于对桩本体以及桩本体与混凝土基层相接位置处进行防水处理,桩本体内的钢筋穿出至桩本体外侧,该防水处理构造包括设置在混凝土基层以及桩本体位于混凝土基层外侧部分上的防水基层,混凝土基层部分上的防水基层上铺设有防水层;所述防水基层为具有渗透性的防水材料,渗入至混凝土基层以及桩本体内。本申请具有提高防水构造施工的效率,减少对防水构造的防水性产生影响的效果。
Pile head waterproof treatment structure and construction method
The invention relates to the field of building waterproof construction, in particular to a pile head waterproof treatment structure. The pile head waterproof treatment structure is used for conducting waterproof treatment on a pile body and the connecting position of the pile body and a concrete base layer, steel bars in the pile body penetrate out of the pile body, the waterproof treatment structure comprises a concrete base layer and a waterproof base layer arranged on the portion, located on the outer side of the concrete base layer, of the pile body, and a waterproof layer is laid on the waterproof base layer on the concrete base layer; and the waterproof base layer is made of waterproof materials with permeability and permeates into the concrete base layer and the pile body. The construction method has the effects of improving the construction efficiency of the waterproof structure and reducing the influence on the waterproofness of the waterproof structure.
本申请涉及建筑防水施工的领域,尤其涉及一种桩头防水处理构造,用于对桩本体以及桩本体与混凝土基层相接位置处进行防水处理,桩本体内的钢筋穿出至桩本体外侧,该防水处理构造包括设置在混凝土基层以及桩本体位于混凝土基层外侧部分上的防水基层,混凝土基层部分上的防水基层上铺设有防水层;所述防水基层为具有渗透性的防水材料,渗入至混凝土基层以及桩本体内。本申请具有提高防水构造施工的效率,减少对防水构造的防水性产生影响的效果。
Pile head waterproof treatment structure and construction method
桩头防水处理构造及施工方法
JING XIAOBO (author)
2021-09-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile head waterproof structure and construction method thereof
European Patent Office | 2020
|Pile head waterproof prefabricated part, waterproof structure and construction method thereof
European Patent Office | 2024
|Construction method for pile head secondary forming waterproof construction
European Patent Office | 2020
|Building foundation pile head waterproof structure and construction method thereof
European Patent Office | 2024
|