A platform for research: civil engineering, architecture and urbanism
Groove bottom reserved soil layer cleaning and leveling device and using method thereof
The invention discloses a groove bottom reserved soil layer cleaning and leveling device and a using method thereof, and the groove bottom reserved soil layer cleaning and leveling device comprises a fixing assembly and a leveling assembly, the fixing assembly is used for installing the leveling assembly, the leveling assembly is used for leveling a groove bottom soil layer, and the leveling assembly is arranged on the fixing assembly. According to the groove bottom reserved soil layer cleaning and leveling device and the using method thereof, the problems that the groove bottom reserved soil layer is low in cleaning speed, low in efficiency and large in safety risk can be solved, the problems that workers are long in operation time, high in labor intensity, prone to fatigue and the like can be solved, the construction efficiency and economical efficiency are greatly improved, and the construction safety is also greatly guaranteed.
一种槽底预留土层清理整平装置及其使用方法,所述槽底预留土层清理整平装置包括:固定组件,用于安装整平组件;整平组件,用于整平槽底土层;所述整平组件设置于所述固定组件上。本申请提供的一种槽底预留土层清理整平装置及其使用方法,既能解决槽底预留土层清理速度慢、效率低、安全风险大,又能解决工人作业时间长、劳动强度大,易疲劳等问题,极大的提高了施工效率及经济性,施工安全性也有了极大的保障。
Groove bottom reserved soil layer cleaning and leveling device and using method thereof
The invention discloses a groove bottom reserved soil layer cleaning and leveling device and a using method thereof, and the groove bottom reserved soil layer cleaning and leveling device comprises a fixing assembly and a leveling assembly, the fixing assembly is used for installing the leveling assembly, the leveling assembly is used for leveling a groove bottom soil layer, and the leveling assembly is arranged on the fixing assembly. According to the groove bottom reserved soil layer cleaning and leveling device and the using method thereof, the problems that the groove bottom reserved soil layer is low in cleaning speed, low in efficiency and large in safety risk can be solved, the problems that workers are long in operation time, high in labor intensity, prone to fatigue and the like can be solved, the construction efficiency and economical efficiency are greatly improved, and the construction safety is also greatly guaranteed.
一种槽底预留土层清理整平装置及其使用方法,所述槽底预留土层清理整平装置包括:固定组件,用于安装整平组件;整平组件,用于整平槽底土层;所述整平组件设置于所述固定组件上。本申请提供的一种槽底预留土层清理整平装置及其使用方法,既能解决槽底预留土层清理速度慢、效率低、安全风险大,又能解决工人作业时间长、劳动强度大,易疲劳等问题,极大的提高了施工效率及经济性,施工安全性也有了极大的保障。
Groove bottom reserved soil layer cleaning and leveling device and using method thereof
一种槽底预留土层清理整平装置及其使用方法
LIU HONGLIANG (author) / SU YUHUA (author) / CHEN GAIHE (author) / HE QINGHUA (author)
2021-09-17
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Groove bottom leveling and curb paving integrated equipment
European Patent Office | 2023
|Foundation pit bottom plate reserved precipitation plugging device and using method thereof
European Patent Office | 2020
|Flue reserved tongue-and-groove hanging-hole-free construction method
European Patent Office | 2024
|