A platform for research: civil engineering, architecture and urbanism
The invention discloses a Belgian road construction method and an elevation controller thereof, and relates to the technical field of road construction. The method comprises the following steps: knowing a drawing, surveying and lofting, erecting a road groove template, binding road groove reinforcing steel bars, mounting a road groove dowel bar, pouring road groove concrete, cutting a contraction joint, caulking the contraction joint, paving granite stones, checking the elevation and the width of the contraction joint of the granite stones, and pouring fine aggregate concrete. The special elevation controller is processed during Belgian road granite paving construction, so that the elevation and spacing of the stones can be detected at the same time, the accuracy and precision of the stones during construction arrangement are greatly improved, the construction period is shortened, the cost is reduced, and the benefit is remarkable.
本发明公开了一种比利时路工法及其标高控制器,涉及道路施工技术领域。本发明包括有以下步骤:熟悉图纸、测量放样、路槽模板支设、路槽钢筋绑扎、路槽传力杆安装、路槽混凝土浇筑、缩缝切割、缩缝嵌缝、铺砌花岗石石块、花岗石石块标高及缝隙宽度检查、细石混凝土浇筑。本发明通过在比利时路花岗岩铺砌施工时加工特制标高控制器,能够同时对石块的标高、间距进行检测,极大的提升了石块在施工排列时的准确度及精度,节省了工期、降低了成本,效益显著。
The invention discloses a Belgian road construction method and an elevation controller thereof, and relates to the technical field of road construction. The method comprises the following steps: knowing a drawing, surveying and lofting, erecting a road groove template, binding road groove reinforcing steel bars, mounting a road groove dowel bar, pouring road groove concrete, cutting a contraction joint, caulking the contraction joint, paving granite stones, checking the elevation and the width of the contraction joint of the granite stones, and pouring fine aggregate concrete. The special elevation controller is processed during Belgian road granite paving construction, so that the elevation and spacing of the stones can be detected at the same time, the accuracy and precision of the stones during construction arrangement are greatly improved, the construction period is shortened, the cost is reduced, and the benefit is remarkable.
本发明公开了一种比利时路工法及其标高控制器,涉及道路施工技术领域。本发明包括有以下步骤:熟悉图纸、测量放样、路槽模板支设、路槽钢筋绑扎、路槽传力杆安装、路槽混凝土浇筑、缩缝切割、缩缝嵌缝、铺砌花岗石石块、花岗石石块标高及缝隙宽度检查、细石混凝土浇筑。本发明通过在比利时路花岗岩铺砌施工时加工特制标高控制器,能够同时对石块的标高、间距进行检测,极大的提升了石块在施工排列时的准确度及精度,节省了工期、降低了成本,效益显著。
Belgian road construction method and elevation controller thereof
一种比利时路工法及其标高控制器
2021-10-01
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Integral ground elevation controller and construction method thereof
European Patent Office | 2016
|Pile top elevation controller device and construction method
European Patent Office | 2024
|