The invention provides a construction method of an underground mass concrete steel formwork. The construction method of the underground mass concrete steel formwork is characterized by comprising the following steps that a, a plurality of steel formworks and fixing parts are customized; b, the multiple fixing parts are pre-buried, and the fixing parts are vertically pre-buried in an original soil layer; c, the steel formworks are connected and spliced, the spliced seams are fully welded, and the steel formworks are fixed to a plain concrete cushion layer through the fixing parts; and d, the steel formworks are checked and accepted after being fixed. The construction method of the underground mass concrete steel formwork has the advantages that the steel formwork is simple in structure, convenient to manufacture, good in reinforcing effect and easy and convenient to operate, the steel formwork can be repeatedly used, and the engineering cost is reduced.
一种地下大体积混凝土钢模板的施工方法,其特征在于包括以下步骤:a、定制若干钢模板及固定件,b、预埋若干固定件,固定件垂直预埋在原土层中,c、将钢模板连接拼合,在拼缝处满焊,且用固定件将钢模板固定在素混凝土垫层上,d、钢模板固定后检查验收。本发明的地下大体积混凝土钢模板的施工方法具有钢模板结构简单、制作方便,钢模板加固效果好、操作简便,钢模板能重复使用和降低工程成本的优点。
The invention provides a construction method of an underground mass concrete steel formwork. The construction method of the underground mass concrete steel formwork is characterized by comprising the following steps that a, a plurality of steel formworks and fixing parts are customized; b, the multiple fixing parts are pre-buried, and the fixing parts are vertically pre-buried in an original soil layer; c, the steel formworks are connected and spliced, the spliced seams are fully welded, and the steel formworks are fixed to a plain concrete cushion layer through the fixing parts; and d, the steel formworks are checked and accepted after being fixed. The construction method of the underground mass concrete steel formwork has the advantages that the steel formwork is simple in structure, convenient to manufacture, good in reinforcing effect and easy and convenient to operate, the steel formwork can be repeatedly used, and the engineering cost is reduced.
一种地下大体积混凝土钢模板的施工方法,其特征在于包括以下步骤:a、定制若干钢模板及固定件,b、预埋若干固定件,固定件垂直预埋在原土层中,c、将钢模板连接拼合,在拼缝处满焊,且用固定件将钢模板固定在素混凝土垫层上,d、钢模板固定后检查验收。本发明的地下大体积混凝土钢模板的施工方法具有钢模板结构简单、制作方便,钢模板加固效果好、操作简便,钢模板能重复使用和降低工程成本的优点。
Construction method of underground mass concrete steel formwork
地下大体积混凝土钢模板的施工方法
GU HENGYU (author)
2021-10-08
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Formwork system for steel reinforced concrete construction and construction method
European Patent Office | 2024
|Concrete plugging piece, formwork and construction method of formwork
European Patent Office | 2023
|