Inclined pile construction method
The invention discloses an inclined pile construction method and aims to overcome the defect that inclined pile construction is inconvenient. The construction method comprises the following steps of: S1, constructing a fender post; S2, driving a sheet pile in a range where the inclined pile needs to be constructed, and defining a closed construction space by the sheet pile and the fender post; S3, obliquely and downwards digging soil in the construction space to form a soil slope; S4, placing the inclined pile on the soil slope; S5, filling the dug soil back into the construction space, and embedding the inclined pile in the soil; S6, pulling out the sheet pile; S7, constructing a cement-soil pile at the lower end of the inclined pile to enable the lower end of the inclined pile and the cement-soil pile to form a whole; and S8, constructing a coping beam at the upper end of the fender post, and anchoring the upper end of the inclined pile into the coping beam. According to the inclined pile construction method, construction of the inclined pile is greatly facilitated, and the construction difficulty of the inclined pile is reduced.
本发明公开了一种斜桩施工方法,旨在解决斜桩施工不便的不足。该发明包括以下步骤:S1,施工围护桩;S2,在需要施工斜桩的范围内打入板桩,板桩和围护桩一起围成一个闭合的施工空间;S3,在施工空间内斜着向下挖土,形成土坡;S4,将斜桩放置到土坡上;S5,将挖出的土回填到施工空间内,使斜桩埋入土中;S6,拔出板桩;S7,在斜桩下端位置施工水泥土桩,使斜桩下端与水泥土桩一起形成一个整体;S8,施工围护桩上端的压顶梁,将斜桩上端锚入压顶梁。这种斜桩施工方法大大方便了斜桩的施工,降低了斜桩的施工难度。
Inclined pile construction method
The invention discloses an inclined pile construction method and aims to overcome the defect that inclined pile construction is inconvenient. The construction method comprises the following steps of: S1, constructing a fender post; S2, driving a sheet pile in a range where the inclined pile needs to be constructed, and defining a closed construction space by the sheet pile and the fender post; S3, obliquely and downwards digging soil in the construction space to form a soil slope; S4, placing the inclined pile on the soil slope; S5, filling the dug soil back into the construction space, and embedding the inclined pile in the soil; S6, pulling out the sheet pile; S7, constructing a cement-soil pile at the lower end of the inclined pile to enable the lower end of the inclined pile and the cement-soil pile to form a whole; and S8, constructing a coping beam at the upper end of the fender post, and anchoring the upper end of the inclined pile into the coping beam. According to the inclined pile construction method, construction of the inclined pile is greatly facilitated, and the construction difficulty of the inclined pile is reduced.
本发明公开了一种斜桩施工方法,旨在解决斜桩施工不便的不足。该发明包括以下步骤:S1,施工围护桩;S2,在需要施工斜桩的范围内打入板桩,板桩和围护桩一起围成一个闭合的施工空间;S3,在施工空间内斜着向下挖土,形成土坡;S4,将斜桩放置到土坡上;S5,将挖出的土回填到施工空间内,使斜桩埋入土中;S6,拔出板桩;S7,在斜桩下端位置施工水泥土桩,使斜桩下端与水泥土桩一起形成一个整体;S8,施工围护桩上端的压顶梁,将斜桩上端锚入压顶梁。这种斜桩施工方法大大方便了斜桩的施工,降低了斜桩的施工难度。
Inclined pile construction method
一种斜桩施工方法
LI YING (author) / XIE JIAWEN (author) / ZHANG JINHONG (author) / CHEN DONG (author) / LIU XINGWANG (author) / TONG XING (author)
2021-10-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Inclined pile guide structure and inclined pile construction method
European Patent Office | 2021
|Construction method of inclined precast pile inclined strut
European Patent Office | 2024
|Inclined pile supporting structure and construction method
European Patent Office | 2021
|