A platform for research: civil engineering, architecture and urbanism
Construction method of fabricated green delicate building system
The invention belongs to the technical field of buildings, and particularly relates to a construction method of a fabricated green delicate building system. The method comprises the following steps that S1, a foundation is constructed, and a supporting structure is arranged on the foundation; S2, a first connecting hole and a second connecting hole are sequentially formed in a bearing column, a supporting column and a supporting frame; S3, a first filler and a second filler are poured into a first shell and a second shell correspondingly, a first reinforcing steel bar and a second reinforcing steel bar are inserted into the first filler and the second filler correspondingly, and a first connecting reinforcing steel bar and a second connecting reinforcing steel bar are inserted into the first shell and the second shell correspondingly. According to the construction method of the fabricated green delicate building system, first assembling plates are fixed to the periphery of the supporting structure through first connecting structures, then second assembling plates are fixed to the top end of the supporting structure through second connecting structures, a bungalow is built in an assembling mode, the construction period can be shortened, the labor intensity can be reduced, and the cost investment can also be reduced.
本发明公开的属于建筑技术领域,具体为一种装配式绿色精致建筑体系的构建方法,S1,构建地基,并在地基上设置支撑结构;S2,在承重柱、支撑柱和支撑架上依次开设出第一连接孔和第二连接孔;S3,在第一壳体和第二壳体中分别倒入第一填充物和第二填充物,并在第一填充物和第二填充物中分别插入第一钢筋和第二钢筋,以及在第一壳体和第二壳体上分别插入第一连接钢筋和第二连接钢筋,本发明通过第一连接结构将第一装配板固定在支撑结构的四周上,再通过第二连接结构将第二装配板固定在支撑结构的顶端上,具有通过装配的方式建造出平房,通过装配的方式建造出房屋,不仅会缩短工期,还会降低劳动强度,以及还会降低成本的投入。
Construction method of fabricated green delicate building system
The invention belongs to the technical field of buildings, and particularly relates to a construction method of a fabricated green delicate building system. The method comprises the following steps that S1, a foundation is constructed, and a supporting structure is arranged on the foundation; S2, a first connecting hole and a second connecting hole are sequentially formed in a bearing column, a supporting column and a supporting frame; S3, a first filler and a second filler are poured into a first shell and a second shell correspondingly, a first reinforcing steel bar and a second reinforcing steel bar are inserted into the first filler and the second filler correspondingly, and a first connecting reinforcing steel bar and a second connecting reinforcing steel bar are inserted into the first shell and the second shell correspondingly. According to the construction method of the fabricated green delicate building system, first assembling plates are fixed to the periphery of the supporting structure through first connecting structures, then second assembling plates are fixed to the top end of the supporting structure through second connecting structures, a bungalow is built in an assembling mode, the construction period can be shortened, the labor intensity can be reduced, and the cost investment can also be reduced.
本发明公开的属于建筑技术领域,具体为一种装配式绿色精致建筑体系的构建方法,S1,构建地基,并在地基上设置支撑结构;S2,在承重柱、支撑柱和支撑架上依次开设出第一连接孔和第二连接孔;S3,在第一壳体和第二壳体中分别倒入第一填充物和第二填充物,并在第一填充物和第二填充物中分别插入第一钢筋和第二钢筋,以及在第一壳体和第二壳体上分别插入第一连接钢筋和第二连接钢筋,本发明通过第一连接结构将第一装配板固定在支撑结构的四周上,再通过第二连接结构将第二装配板固定在支撑结构的顶端上,具有通过装配的方式建造出平房,通过装配的方式建造出房屋,不仅会缩短工期,还会降低劳动强度,以及还会降低成本的投入。
Construction method of fabricated green delicate building system
一种装配式绿色精致建筑体系的构建方法
XU KAIHONG (author) / HUANG YOU (author) / YE SIJING (author) / ZHOU RONG (author)
2021-11-26
Patent
Electronic Resource
Chinese
Construction method for delicate building and green building
European Patent Office | 2021
|Fabricated green building system and construction method thereof
European Patent Office | 2024
|