A platform for research: civil engineering, architecture and urbanism
Construction method for rapid plugging through shear wall post-cast strip prefabricated slab
The invention discloses a construction method for rapid plugging through a shear wall post-cast strip prefabricated slab. The construction method comprises the following steps that the size of the shear wall post-cast strip prefabricated slab according to the height and the width of a shear wall post-cast strip is determined, and the shear wall post-cast strip prefabricated slab is processed; the width of the shear wall post-cast strip prefabricated slab is larger than that of the shear wall post-cast strip, and water stop screws and tie bars are reserved on the shear wall post-cast strip prefabricated slab. The shear wall post-cast strip prefabricated slab is hoisted, the shear wall post-cast strip is sealed by the shear wall post-cast strip prefabricated slab, and the tie bars and the water stop screws are located on the side close to a shear wall; the tie bars are anchored and bound with main bars of the shear wall; and post-cast strip concrete pouring is carried out after a formwork for sealing the shear wall post-cast strip is erected through the water stop screws. According to the construction method for rapid plugging through the shear wall post-cast strip prefabricated slab, the cost is low, the construction speed is high, the construction efficiency is high, and the construction method for rapid plugging through the shear wall post-cast strip prefabricated slab has great application prospects.
本发明公开了一种应用剪力墙后浇带预制板进行快速封堵的施工方法,方法:根据剪力墙后浇带的高度及宽度确定剪力墙后浇带预制板的尺寸并加工剪力墙后浇带预制板,剪力墙后浇带预制板的宽度大于剪力墙后浇带的宽度且剪力墙后浇带预制板上预留有止水螺杆和拉结筋;吊装剪力墙后浇带预制板将剪力墙后浇带预制板封闭剪力墙后浇带且拉结筋及止水螺杆位于靠近剪力墙侧;拉结筋与剪力墙的主筋锚固绑扎;利用止水螺杆搭设封闭剪力墙后浇带的模板后进行后浇带砼浇注。本发明的应用剪力墙后浇带预制板进行快速封堵的施工方法,不仅成本低廉,而且施工速度快,施工效率高,极具应用前景。
Construction method for rapid plugging through shear wall post-cast strip prefabricated slab
The invention discloses a construction method for rapid plugging through a shear wall post-cast strip prefabricated slab. The construction method comprises the following steps that the size of the shear wall post-cast strip prefabricated slab according to the height and the width of a shear wall post-cast strip is determined, and the shear wall post-cast strip prefabricated slab is processed; the width of the shear wall post-cast strip prefabricated slab is larger than that of the shear wall post-cast strip, and water stop screws and tie bars are reserved on the shear wall post-cast strip prefabricated slab. The shear wall post-cast strip prefabricated slab is hoisted, the shear wall post-cast strip is sealed by the shear wall post-cast strip prefabricated slab, and the tie bars and the water stop screws are located on the side close to a shear wall; the tie bars are anchored and bound with main bars of the shear wall; and post-cast strip concrete pouring is carried out after a formwork for sealing the shear wall post-cast strip is erected through the water stop screws. According to the construction method for rapid plugging through the shear wall post-cast strip prefabricated slab, the cost is low, the construction speed is high, the construction efficiency is high, and the construction method for rapid plugging through the shear wall post-cast strip prefabricated slab has great application prospects.
本发明公开了一种应用剪力墙后浇带预制板进行快速封堵的施工方法,方法:根据剪力墙后浇带的高度及宽度确定剪力墙后浇带预制板的尺寸并加工剪力墙后浇带预制板,剪力墙后浇带预制板的宽度大于剪力墙后浇带的宽度且剪力墙后浇带预制板上预留有止水螺杆和拉结筋;吊装剪力墙后浇带预制板将剪力墙后浇带预制板封闭剪力墙后浇带且拉结筋及止水螺杆位于靠近剪力墙侧;拉结筋与剪力墙的主筋锚固绑扎;利用止水螺杆搭设封闭剪力墙后浇带的模板后进行后浇带砼浇注。本发明的应用剪力墙后浇带预制板进行快速封堵的施工方法,不仅成本低廉,而且施工速度快,施工效率高,极具应用前景。
Construction method for rapid plugging through shear wall post-cast strip prefabricated slab
一种应用剪力墙后浇带预制板进行快速封堵的施工方法
YAN ZHENJIANG (author)
2021-12-17
Patent
Electronic Resource
Chinese
Post-cast strip side wall plugging device and post-cast strip side wall plugging construction method
European Patent Office | 2024
|Construction method for reinforcing post-cast slab strip of prefabricated laminated slab
European Patent Office | 2023
|European Patent Office | 2021
|Prefabricated slab assembled retaining wall for vertical post-cast strip of outer wall
European Patent Office | 2021
|Basement exterior wall post-cast strip U-shaped concrete prefabricated slab blocking method
European Patent Office | 2022
|