A platform for research: civil engineering, architecture and urbanism
Concrete box formwork, manufacturing method thereof and building construction method
The invention relates to the technical field of prefabricated buildings, in particular to a concrete box formwork and a manufacturing method and application thereof.The concrete box formwork comprises a bottom plate and a top plate, wherein a first partition wall is arranged on one side of the top of the bottom plate, a shear wall is arranged on the opposite side of the top of the bottom plate, the top plate is arranged at the top of the first partition wall and the top of the shear wall, a first beam formwork is arranged at the top of the first partition wall, one end of the top plate is connected with one side of the top of the first beam formwork, a second beam formwork is arranged at the top of the shear wall, the opposite end of the top plate is connected with the top of the second beam formwork, and a second partition wall is arranged on the side, away from the first partition wall, of the shear wall. The application has the effect of improving the construction efficiency of a concrete building.
本申请涉及预制装配建筑的技术领域,尤其是涉及一种混凝土箱模、制作方法及其应用,其包括底板以及顶板,所述底板的顶部一侧设置有第一隔墙,所述底板顶部相对的一侧设置有剪力墙,所述顶板分别设置于所述第一隔墙以及所述剪力墙的顶部,所述第一隔墙的顶部设置有第一梁模,所述顶板的一端与所述第一梁模的顶部一侧相连接,所述剪力墙的顶部设置有第二梁模,所述顶板的相对一端与所述第二梁模的顶部相连接,所述剪力墙背离所述第一隔墙的一侧设置有第二隔墙。本申请具有提高混凝土建筑的施工效率的效果。
Concrete box formwork, manufacturing method thereof and building construction method
The invention relates to the technical field of prefabricated buildings, in particular to a concrete box formwork and a manufacturing method and application thereof.The concrete box formwork comprises a bottom plate and a top plate, wherein a first partition wall is arranged on one side of the top of the bottom plate, a shear wall is arranged on the opposite side of the top of the bottom plate, the top plate is arranged at the top of the first partition wall and the top of the shear wall, a first beam formwork is arranged at the top of the first partition wall, one end of the top plate is connected with one side of the top of the first beam formwork, a second beam formwork is arranged at the top of the shear wall, the opposite end of the top plate is connected with the top of the second beam formwork, and a second partition wall is arranged on the side, away from the first partition wall, of the shear wall. The application has the effect of improving the construction efficiency of a concrete building.
本申请涉及预制装配建筑的技术领域,尤其是涉及一种混凝土箱模、制作方法及其应用,其包括底板以及顶板,所述底板的顶部一侧设置有第一隔墙,所述底板顶部相对的一侧设置有剪力墙,所述顶板分别设置于所述第一隔墙以及所述剪力墙的顶部,所述第一隔墙的顶部设置有第一梁模,所述顶板的一端与所述第一梁模的顶部一侧相连接,所述剪力墙的顶部设置有第二梁模,所述顶板的相对一端与所述第二梁模的顶部相连接,所述剪力墙背离所述第一隔墙的一侧设置有第二隔墙。本申请具有提高混凝土建筑的施工效率的效果。
Concrete box formwork, manufacturing method thereof and building construction method
一种混凝土箱模及其制作方法、一种建筑施工方法
ZHANG HAIPENG (author) / YANG WEIDONG (author) / ZHANG ZONGJUN (author) / WANG QIONG (author) / ZHAO BAOJUN (author) / GAO BOSHEN (author) / TAN JUNJUN (author) / LIAO YI'AN (author) / MENG HUI (author) / DING TAO (author)
2021-12-21
Patent
Electronic Resource
Chinese