A platform for research: civil engineering, architecture and urbanism
Concrete side wall hole plugging construction device and method
The invention discloses a concrete side wall hole plugging construction device and a method in the technical field of metallurgical construction. The concrete side wall hole plugging construction device comprises an outward-convex inward-concave table arranged above a side wall, a stepped outward-concave inward-convex table arranged below the side wall, and a pouring chute formed in the inner side of the side wall, a concrete layer is arranged in the middle of the side wall, reinforcing mechanisms are arranged on the inner side wall and the outer side wall of a wall body, a chute reinforcing unit is arranged above the inner side wall of the wall body, and a waterproof unit is arranged on the outer side wall of the wall body. According to the concrete side wall hole plugging construction device and the method, the concrete vibrating effect is good, the whole hole can be filled, the construction cost is reduced, and the waterproof effect is greatly improved.
本发明公开了冶金建设技术领域的一种混凝土侧墙孔洞封堵施工装置,该混凝土侧墙孔洞封堵施工装置包括设置在侧墙上方的外凸内凹台,设置在侧墙下方的阶梯型的外凹内凸台,设置在侧墙内侧的浇筑斜槽,设置在侧墙中间的混凝土层,设置在墙体内侧壁和墙体外侧壁上的加固机构以及设置在墙体内侧壁上方的斜槽加固单元以及设置在墙体外侧壁上的防水单元。本发明还公开了冶金建设技术领域的一种混凝土侧墙孔洞封堵施工方法,该混凝土侧墙孔洞封堵施工装置及方法混凝土振捣效果好,可以充满整个孔洞,降低施工成本,防水效果大大增加。
Concrete side wall hole plugging construction device and method
The invention discloses a concrete side wall hole plugging construction device and a method in the technical field of metallurgical construction. The concrete side wall hole plugging construction device comprises an outward-convex inward-concave table arranged above a side wall, a stepped outward-concave inward-convex table arranged below the side wall, and a pouring chute formed in the inner side of the side wall, a concrete layer is arranged in the middle of the side wall, reinforcing mechanisms are arranged on the inner side wall and the outer side wall of a wall body, a chute reinforcing unit is arranged above the inner side wall of the wall body, and a waterproof unit is arranged on the outer side wall of the wall body. According to the concrete side wall hole plugging construction device and the method, the concrete vibrating effect is good, the whole hole can be filled, the construction cost is reduced, and the waterproof effect is greatly improved.
本发明公开了冶金建设技术领域的一种混凝土侧墙孔洞封堵施工装置,该混凝土侧墙孔洞封堵施工装置包括设置在侧墙上方的外凸内凹台,设置在侧墙下方的阶梯型的外凹内凸台,设置在侧墙内侧的浇筑斜槽,设置在侧墙中间的混凝土层,设置在墙体内侧壁和墙体外侧壁上的加固机构以及设置在墙体内侧壁上方的斜槽加固单元以及设置在墙体外侧壁上的防水单元。本发明还公开了冶金建设技术领域的一种混凝土侧墙孔洞封堵施工方法,该混凝土侧墙孔洞封堵施工装置及方法混凝土振捣效果好,可以充满整个孔洞,降低施工成本,防水效果大大增加。
Concrete side wall hole plugging construction device and method
混凝土侧墙孔洞封堵施工装置及方法
CHEN CHEN (author) / WANG DAIFA (author) / LIANG ZHIJUN (author) / DONG HAIXU (author)
2021-12-21
Patent
Electronic Resource
Chinese
Concrete wall column screw hole plugging construction method
European Patent Office | 2023
|Building side wall structure hole plugging assembly and plugging method
European Patent Office | 2022
|Roof air shaft side wall hole plugging structure and plugging method
European Patent Office | 2023
|