Construction method for raft of oversized clean workshop
The invention discloses a construction method for a raft of a super-large clean workshop. The construction method comprises the following steps that S1, a prefabricated GRC moulding bed is installed at a pile cap; S2, concrete pouring of the raft plates is conducted through a warehouse jumping method; and S3, the plane of the poured raft is leveled in a laser fine leveling mode. According to the construction method, the flatness of the concrete surface can reach the degree that the deviation is not larger than 2 mm within the range of 2 m * 2 m, the re-measured elevation deviation per 2 m does not exceed 2 mm, the flatness of the concrete surface is improved to a great extent, due to the fact that the post-cast strip is canceled through construction of the skip method, the expansion reinforcing strip is adopted for processing the construction joint, the integrity of the high-precision raft is improved, and the construction cost is reduced. The surface finishing quality is ensured.
本发明公开了一种超大洁净厂房筏板施工方法,本发明包括如下步骤:S1、在桩承台处安装预制GRC胎模;S2、采用跳仓法进行混凝土浇筑筏板;S3、采用激光精平方式对浇筑后的筏板平面进行整平。本发明的施工方法混凝土面平整度能达到2m×2m范围内偏差不大于2mm的程度,且每2m复测标高偏差不超过2mm,极大程度上提高了混凝土面的平整度,因采用“跳仓法”施工将后浇带取消,采用膨胀加强带处理施工缝,提高了高精度筏板的整体性,保证了收面质量。
Construction method for raft of oversized clean workshop
The invention discloses a construction method for a raft of a super-large clean workshop. The construction method comprises the following steps that S1, a prefabricated GRC moulding bed is installed at a pile cap; S2, concrete pouring of the raft plates is conducted through a warehouse jumping method; and S3, the plane of the poured raft is leveled in a laser fine leveling mode. According to the construction method, the flatness of the concrete surface can reach the degree that the deviation is not larger than 2 mm within the range of 2 m * 2 m, the re-measured elevation deviation per 2 m does not exceed 2 mm, the flatness of the concrete surface is improved to a great extent, due to the fact that the post-cast strip is canceled through construction of the skip method, the expansion reinforcing strip is adopted for processing the construction joint, the integrity of the high-precision raft is improved, and the construction cost is reduced. The surface finishing quality is ensured.
本发明公开了一种超大洁净厂房筏板施工方法,本发明包括如下步骤:S1、在桩承台处安装预制GRC胎模;S2、采用跳仓法进行混凝土浇筑筏板;S3、采用激光精平方式对浇筑后的筏板平面进行整平。本发明的施工方法混凝土面平整度能达到2m×2m范围内偏差不大于2mm的程度,且每2m复测标高偏差不超过2mm,极大程度上提高了混凝土面的平整度,因采用“跳仓法”施工将后浇带取消,采用膨胀加强带处理施工缝,提高了高精度筏板的整体性,保证了收面质量。
Construction method for raft of oversized clean workshop
一种超大洁净厂房筏板施工方法
ZHANG QIN (author) / WANG XIHE (author) / LUAN HUAFENG (author) / XU LIANG (author) / FENG ZEQUAN (author) / LI SHENGKUN (author) / ZHANG RUIYUAN (author)
2021-12-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction process for raft foundation of oversized equipment
European Patent Office | 2022
|Bamboo raft pile oversized cofferdam and construction method for sea reclamation by adopting same
European Patent Office | 2015
|Construction method of oversized cantilever steel structure
European Patent Office | 2024
|