Earthwork hoisting system and method for manual hole digging pile at bottom of foundation pit
The invention relates to the field of buildings, and provides an earthwork hoisting system and method for a manual hole digging pile at the bottom of a foundation pit. The hoisting system comprises a soil hoisting module arranged in the foundation pit, and an unearthed module arranged on a first-layer trestle plate, wherein the soil hoisting module comprises a first container and a first lifting device connected with the first container, the unearthing module comprises a second container and a second lifting device connected with the second container. The earthwork hoisting system and method for the manual hole digging pile at the bottom of the foundation pit has the beneficial effects that through mutual cooperation of the soil hoisting module arranged in the foundation pit and the soil discharging module arranged on the first-layer trestle plate, whole-process transportation of manual hole digging pile earthwork from the interior of a pile hole to the first-layer trestle plate can be achieved, the mechanization degree is improved, manpower input is greatly reduced, and the management efficiency is improved.
本申请涉及建筑领域,提供一种用于基坑底人工挖孔桩的土方吊运系统及方法,吊运系统包括:吊土模块,设置在基坑内;及出土模块,设置在首层栈桥板上;吊土模块包括第一容器和与第一容器连接的第一起重装置;出土模块包括第二容器和与第二容器连接的第二起重装置。本发明基坑底人工挖孔桩土方吊运系统的有益效果是:通过设置在基坑内的吊土模块和设置在首层栈桥板上的出土模块相互配合,可以实现人工挖孔桩土方由桩孔内到首层栈桥板的全过程运输,提高了机械化程度,大大减少了人力投入,提高了管理效率。
Earthwork hoisting system and method for manual hole digging pile at bottom of foundation pit
The invention relates to the field of buildings, and provides an earthwork hoisting system and method for a manual hole digging pile at the bottom of a foundation pit. The hoisting system comprises a soil hoisting module arranged in the foundation pit, and an unearthed module arranged on a first-layer trestle plate, wherein the soil hoisting module comprises a first container and a first lifting device connected with the first container, the unearthing module comprises a second container and a second lifting device connected with the second container. The earthwork hoisting system and method for the manual hole digging pile at the bottom of the foundation pit has the beneficial effects that through mutual cooperation of the soil hoisting module arranged in the foundation pit and the soil discharging module arranged on the first-layer trestle plate, whole-process transportation of manual hole digging pile earthwork from the interior of a pile hole to the first-layer trestle plate can be achieved, the mechanization degree is improved, manpower input is greatly reduced, and the management efficiency is improved.
本申请涉及建筑领域,提供一种用于基坑底人工挖孔桩的土方吊运系统及方法,吊运系统包括:吊土模块,设置在基坑内;及出土模块,设置在首层栈桥板上;吊土模块包括第一容器和与第一容器连接的第一起重装置;出土模块包括第二容器和与第二容器连接的第二起重装置。本发明基坑底人工挖孔桩土方吊运系统的有益效果是:通过设置在基坑内的吊土模块和设置在首层栈桥板上的出土模块相互配合,可以实现人工挖孔桩土方由桩孔内到首层栈桥板的全过程运输,提高了机械化程度,大大减少了人力投入,提高了管理效率。
Earthwork hoisting system and method for manual hole digging pile at bottom of foundation pit
一种用于基坑底人工挖孔桩的土方吊运系统及方法
SUN JIANWEI (author) / WEN JIANGTAO (author) / JIANG ZHANGZHANG (author) / CHEN HAO (author) / GAO BO (author) / LONG YANMING (author) / LIU YUHUAN (author)
2021-12-28
Patent
Electronic Resource
Chinese
Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|Construction method of manual hole digging pile and manual hole digging pile
European Patent Office | 2021
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|Manual hole digging pile structure and digging pile pouring method
European Patent Office | 2020
|