The invention discloses a steel structure factory building construction structure, and relates to the technical field of steel structure construction. The steel structure factory building construction structure comprises a base and channel steel, wherein the base is provided with two groups of mounting plates, a jacking toothed rod and gear sets, the two groups of mounting plates are arranged on the two sides of the base in a staggered manner, the jacking toothed rod is in sliding connection with a straight rod fixedly arranged in the middle of the base, a horizontally-arranged jacking rod is fixedly arranged at the top of the jacking toothed rod, a buffering mechanism is arranged on the jacking toothed rod, and the number of the gear sets is two, and each gear set comprises a first gear and a second gear which are rotationally arranged on the mounting plate. According to the steel structure factory building construction structure, the two pieces of channel steel are driven by a motor to move oppositely to complete butt joint, the problem that in the prior art, the two pieces of channel steel are manually spliced in the air, welding is completed, and dangerousness is large is solved, construction safety is improved, and the labor intensity of workers is reduced.
本发明公开了一种钢结构厂房建造搭建结构,涉及钢结构施工技术领域,包括底座和槽钢,所述底座上设有:安装板,所述安装板分为两组,两组所述安装板错位设置与底座的两侧;顶升齿杆,所述顶升齿杆与固定设置在底座中间的直杆滑动连接,所述顶升齿杆顶部固定设置有水平设置的顶杆,且所述顶升齿杆上设置有缓冲机构;齿轮组,所述齿轮组分为两组,且所述齿轮组包括转动设置于安装板上的第一齿轮和第二齿轮。本发明通过电机驱动使两个槽钢相向移动,完成对接,解决了现有技术中人工在高空中将两个槽钢相互拼接并完成焊接危险性大的问题,提高了施工安全性,降低了工人的劳动强度。
The invention discloses a steel structure factory building construction structure, and relates to the technical field of steel structure construction. The steel structure factory building construction structure comprises a base and channel steel, wherein the base is provided with two groups of mounting plates, a jacking toothed rod and gear sets, the two groups of mounting plates are arranged on the two sides of the base in a staggered manner, the jacking toothed rod is in sliding connection with a straight rod fixedly arranged in the middle of the base, a horizontally-arranged jacking rod is fixedly arranged at the top of the jacking toothed rod, a buffering mechanism is arranged on the jacking toothed rod, and the number of the gear sets is two, and each gear set comprises a first gear and a second gear which are rotationally arranged on the mounting plate. According to the steel structure factory building construction structure, the two pieces of channel steel are driven by a motor to move oppositely to complete butt joint, the problem that in the prior art, the two pieces of channel steel are manually spliced in the air, welding is completed, and dangerousness is large is solved, construction safety is improved, and the labor intensity of workers is reduced.
本发明公开了一种钢结构厂房建造搭建结构,涉及钢结构施工技术领域,包括底座和槽钢,所述底座上设有:安装板,所述安装板分为两组,两组所述安装板错位设置与底座的两侧;顶升齿杆,所述顶升齿杆与固定设置在底座中间的直杆滑动连接,所述顶升齿杆顶部固定设置有水平设置的顶杆,且所述顶升齿杆上设置有缓冲机构;齿轮组,所述齿轮组分为两组,且所述齿轮组包括转动设置于安装板上的第一齿轮和第二齿轮。本发明通过电机驱动使两个槽钢相向移动,完成对接,解决了现有技术中人工在高空中将两个槽钢相互拼接并完成焊接危险性大的问题,提高了施工安全性,降低了工人的劳动强度。
Steel structure factory building construction structure
一种钢结构厂房建造搭建结构
NI YAOJUN (author)
2022-01-04
Patent
Electronic Resource
Chinese
Construction method of heightened steel structure factory building
European Patent Office | 2024
|Steel structure factory building and construction method thereof
European Patent Office | 2023
|Maintenance construction method for steel structure factory building
European Patent Office | 2022
|Fireproof steel structure factory building and construction method
European Patent Office | 2021
|Construction process for large steel structure factory building
European Patent Office | 2023
|