Construction method of heightened steel structure factory building
The invention discloses a construction method for heightening a steel structure factory building, and relates to the technical field of steel structure construction, the construction method comprises the following construction steps: S1, disconnecting a roof steel structure from a foundation steel column; s2, a temporary supporting frame is erected between every two adjacent foundation steel columns; s3, the roof steel structure is horizontally pushed to be supported above the temporary supporting frame, and the left row of foundation steel columns are exposed; s4, a first heightened steel column is installed above the foundation steel column on one side, and a second heightened steel column is fixed to the lower portion of the right side of the roof steel structure; and S5, the roof steel structure is integrally hoisted upwards till the first heightened steel columns and the second heightened steel columns are in butt joint with the foundation steel columns below in a one-to-one correspondence mode and are fixed. According to the construction method, the original structure of the steel structure factory building is fully reserved, an additional construction site is not needed, the heightening construction cost of the steel structure factory building is less, the construction cost is lower, and damage to the original structure of the steel structure factory building is reduced.
本申请公开了一种加高钢结构厂房的施工方法,涉及钢结构施工的技术领域,包括以下施工步骤:S1:断开屋顶钢结构和基础钢柱之间的连接;S2:在相邻两根基础钢柱之间搭设临时支撑架;S3:水平推移屋顶钢结构,使屋顶钢结构支撑于临时支撑架上方,并露出左排基础钢柱;S4:在一侧的基础钢柱上方安装第一加高钢柱,在屋顶钢结构右侧的下方固定第二加高钢柱;S5:整体向上吊装屋顶钢结构至第一加高钢柱和第二加高钢柱分别一一对应与下方的基础钢柱对接并固定。本申请施工方法充分保留了钢结构厂房的原有结构,无需额外施工场地,使得对钢结构厂房的加高施工费材更少,施工成本更低且降低了对钢结构厂房原有结构的破坏。
Construction method of heightened steel structure factory building
The invention discloses a construction method for heightening a steel structure factory building, and relates to the technical field of steel structure construction, the construction method comprises the following construction steps: S1, disconnecting a roof steel structure from a foundation steel column; s2, a temporary supporting frame is erected between every two adjacent foundation steel columns; s3, the roof steel structure is horizontally pushed to be supported above the temporary supporting frame, and the left row of foundation steel columns are exposed; s4, a first heightened steel column is installed above the foundation steel column on one side, and a second heightened steel column is fixed to the lower portion of the right side of the roof steel structure; and S5, the roof steel structure is integrally hoisted upwards till the first heightened steel columns and the second heightened steel columns are in butt joint with the foundation steel columns below in a one-to-one correspondence mode and are fixed. According to the construction method, the original structure of the steel structure factory building is fully reserved, an additional construction site is not needed, the heightening construction cost of the steel structure factory building is less, the construction cost is lower, and damage to the original structure of the steel structure factory building is reduced.
本申请公开了一种加高钢结构厂房的施工方法,涉及钢结构施工的技术领域,包括以下施工步骤:S1:断开屋顶钢结构和基础钢柱之间的连接;S2:在相邻两根基础钢柱之间搭设临时支撑架;S3:水平推移屋顶钢结构,使屋顶钢结构支撑于临时支撑架上方,并露出左排基础钢柱;S4:在一侧的基础钢柱上方安装第一加高钢柱,在屋顶钢结构右侧的下方固定第二加高钢柱;S5:整体向上吊装屋顶钢结构至第一加高钢柱和第二加高钢柱分别一一对应与下方的基础钢柱对接并固定。本申请施工方法充分保留了钢结构厂房的原有结构,无需额外施工场地,使得对钢结构厂房的加高施工费材更少,施工成本更低且降低了对钢结构厂房原有结构的破坏。
Construction method of heightened steel structure factory building
一种加高钢结构厂房的施工方法
MIN XIUMING (author) / ZHANG GUOYONG (author) / HE GUANGLI (author) / YANG HAIBO (author) / HUANG XIAOHANG (author)
2024-11-08
Patent
Electronic Resource
Chinese
Maintenance construction method for steel structure factory building
European Patent Office | 2022
|Fireproof steel structure factory building and construction method
European Patent Office | 2021
|Steel structure factory building and construction method thereof
European Patent Office | 2023
|Modular construction method for fabricated steel structure factory building
European Patent Office | 2024
|