A platform for research: civil engineering, architecture and urbanism
Steel structure factory building and construction method thereof
The invention provides a steel structure factory building and a construction method thereof, and belongs to the field of steel structure factory building manufacturing and installing.The steel structure factory building comprises a pile foundation, a bearing platform and a steel structure frame, the pile foundation is arranged underground, and part of the structure of the pile foundation is fixedly connected with the bearing platform; the steel structure frame is connected with the bearing platform, and a connecting beam is installed on the steel structure frame. According to the steel structure factory building and the construction method thereof, the traditional construction technology is changed, the safety performance of installation personnel is enhanced, the working efficiency is improved, and the cost is saved. And the construction period is shortened. Specifically, according to the steel structure design principle, the stability of the portal rigid frame is closely related to the length of a rod piece, the slenderness ratio of the rod piece is closely related to the length of the rod piece, and due to the fact that an original underground connecting beam is arranged on the ground, the calculated length of the rod piece is shortened, and the steel consumption of the portal rigid frame is reduced, the raw material cost is saved.
本发明提供了一种钢结构厂房及其施工方法,属于钢结构厂房制作安装领域,包括桩基、承台以及钢结构架,承台部分结构设置于地面之下;桩基设置于地面之下,桩基的部分结构与承台连接固定;钢结构架与承台连接,钢结构架上安装有连系梁。本发明提供的一种钢结构厂房及其施工方法,改变了传统的施工工艺,加强了安装人员的安全性能、提高工作效率、节约成本。且具有缩短施工工期的优点。具体的是,本结构根据钢结构设计原理、门式刚架的稳定与杆件长短密切相关、杆件的长细比与杆件的长短密切相关、因为原地下的连系梁提设置于地面之上缩短了杆件计算长度,咸少了门式刚架的用钢量所以节约了原材料成本。
Steel structure factory building and construction method thereof
The invention provides a steel structure factory building and a construction method thereof, and belongs to the field of steel structure factory building manufacturing and installing.The steel structure factory building comprises a pile foundation, a bearing platform and a steel structure frame, the pile foundation is arranged underground, and part of the structure of the pile foundation is fixedly connected with the bearing platform; the steel structure frame is connected with the bearing platform, and a connecting beam is installed on the steel structure frame. According to the steel structure factory building and the construction method thereof, the traditional construction technology is changed, the safety performance of installation personnel is enhanced, the working efficiency is improved, and the cost is saved. And the construction period is shortened. Specifically, according to the steel structure design principle, the stability of the portal rigid frame is closely related to the length of a rod piece, the slenderness ratio of the rod piece is closely related to the length of the rod piece, and due to the fact that an original underground connecting beam is arranged on the ground, the calculated length of the rod piece is shortened, and the steel consumption of the portal rigid frame is reduced, the raw material cost is saved.
本发明提供了一种钢结构厂房及其施工方法,属于钢结构厂房制作安装领域,包括桩基、承台以及钢结构架,承台部分结构设置于地面之下;桩基设置于地面之下,桩基的部分结构与承台连接固定;钢结构架与承台连接,钢结构架上安装有连系梁。本发明提供的一种钢结构厂房及其施工方法,改变了传统的施工工艺,加强了安装人员的安全性能、提高工作效率、节约成本。且具有缩短施工工期的优点。具体的是,本结构根据钢结构设计原理、门式刚架的稳定与杆件长短密切相关、杆件的长细比与杆件的长短密切相关、因为原地下的连系梁提设置于地面之上缩短了杆件计算长度,咸少了门式刚架的用钢量所以节约了原材料成本。
Steel structure factory building and construction method thereof
一种钢结构厂房及其施工方法
DING XIAOHONG (author)
2023-09-12
Patent
Electronic Resource
Chinese
Prefabricated light steel structure factory building and construction method thereof
European Patent Office | 2021
|Lightweight steel structure factory building and construction process thereof
European Patent Office | 2023
|Assembly type light steel structure factory building and construction method thereof
European Patent Office | 2021
|Construction method of heightened steel structure factory building
European Patent Office | 2024
|