A platform for research: civil engineering, architecture and urbanism
Sand stabilization barrier and preparation method and sand stabilization method thereof
The invention discloses a sand stabilization barrier and a preparation method and sand stabilization method thereof. The sand stabilization barrier comprises a plurality of sand stabilization plates and a plurality of connecting pieces, a plurality of symmetrically-distributed clamping grooves are formed in each connecting piece, each sand stabilization plate is inserted into the corresponding clamping groove, and the corners of the sand stabilization plates are fixedly connected with the clamping grooves in an inserted mode; and under the connecting action of the connecting pieces, the sand stabilization plates are arranged in a grid mode to form the sand stabilization barrier, and the sand stabilization plates and the connecting pieces are formed by curing magnesium cement mortar. According to the sand stabilization barrier and the preparation method and sand stabilization method thereof, the sand stabilization plate is high in strength, and the sand stabilization barrier can be continuously recycled during application and is not affected by terrains.
本发明公开了一种固沙屏障及其制备方法和固沙方法,所述固沙屏障包括多个固沙板和多个连接件,每一连接件上形成有多个对称分布的卡槽,每个卡槽供一个固沙板插入,所述固沙板的边角与所述卡槽插入式固定连接,在所述连接件的连接作用下,所述固沙板呈网格排布形成固沙屏障,其中所述固沙板和连接件由镁水泥砂浆固化成型。所述固沙板强度高,固沙屏障应用时可持续循环利用,不受地形的影响。
Sand stabilization barrier and preparation method and sand stabilization method thereof
The invention discloses a sand stabilization barrier and a preparation method and sand stabilization method thereof. The sand stabilization barrier comprises a plurality of sand stabilization plates and a plurality of connecting pieces, a plurality of symmetrically-distributed clamping grooves are formed in each connecting piece, each sand stabilization plate is inserted into the corresponding clamping groove, and the corners of the sand stabilization plates are fixedly connected with the clamping grooves in an inserted mode; and under the connecting action of the connecting pieces, the sand stabilization plates are arranged in a grid mode to form the sand stabilization barrier, and the sand stabilization plates and the connecting pieces are formed by curing magnesium cement mortar. According to the sand stabilization barrier and the preparation method and sand stabilization method thereof, the sand stabilization plate is high in strength, and the sand stabilization barrier can be continuously recycled during application and is not affected by terrains.
本发明公开了一种固沙屏障及其制备方法和固沙方法,所述固沙屏障包括多个固沙板和多个连接件,每一连接件上形成有多个对称分布的卡槽,每个卡槽供一个固沙板插入,所述固沙板的边角与所述卡槽插入式固定连接,在所述连接件的连接作用下,所述固沙板呈网格排布形成固沙屏障,其中所述固沙板和连接件由镁水泥砂浆固化成型。所述固沙板强度高,固沙屏障应用时可持续循环利用,不受地形的影响。
Sand stabilization barrier and preparation method and sand stabilization method thereof
一种固沙屏障及其制备方法和固沙方法
XIAO XUEYING (author) / ZHENG WEIXIN (author) / WEN JING (author) / CHANG CHENGGONG (author) / DONG JINMEI (author) / LI YING (author)
2022-01-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Integrated sand stabilization plate and preparation method and sand stabilization method thereof
European Patent Office | 2022
|Sand stabilization method and portable sand stabilization device
European Patent Office | 2024
|European Patent Office | 2015
|Full-biodegradable mulching film sand stabilization grid and sand stabilization method thereof
European Patent Office | 2024
|