A platform for research: civil engineering, architecture and urbanism
Upper jacket for deepwater wind power and construction process
The invention discloses an upper jacket for deepwater wind power and a construction process, and relates to the technical field of deepwater wind power, in particular to the upper jacket for deepwater wind power and the construction process, the upper jacket for deepwater wind power comprises a first guide pipe leg, and a mounting pipe is arranged on the outer wall of the first guide pipe leg; a first flower piece which is mounted in the mounting pipe, and a second flower piece is mounted on the right side of the first flower piece; a second guide pipe leg which is arranged on the left side of the first flower piece; a supporting plate which arranged below the first guide pipe leg, and a mounting groove is formed in the outer wall of the supporting plate; an inner center truss which is arranged on the inner side of the supporting plate. The upper jacket for deepwater wind power is provided with the inner center truss, the design of a base supported by an integrated scaffold is considered, and the upper jacket has high-precision and reusable positioning and supporting, so that the process of repeatedly assembling and disassembling the scaffold can be reduced, and the practicability of the device in the using process is improved.
本发明公开了一种深水风电用上部导管架及建造工艺,涉及深水风电技术领域,具体为一种深水风电用上部导管架及建造工艺,深水风电用上部导管架包括第一导管腿,所述第一导管腿的外壁设置有安装管;第一花片,其安装在所述安装管的内部,所述第一花片的右侧安装有第二花片;第二导管腿,其设置在所述第一花片的左侧;支撑板,其设置在所述第一导管腿的下方,所述支撑板的外壁开设有安装槽;内中心衍架,其设置在所述支撑板的内侧。该深水风电用上部导管架设置有内中心衍架,兼顾了集成脚手架支撑的基座设计,具有高精度、可重复使用的定位及支撑,从而能够减少脚手架反复搭拆的过程,提高了装置在使用过程中的实用性。
Upper jacket for deepwater wind power and construction process
The invention discloses an upper jacket for deepwater wind power and a construction process, and relates to the technical field of deepwater wind power, in particular to the upper jacket for deepwater wind power and the construction process, the upper jacket for deepwater wind power comprises a first guide pipe leg, and a mounting pipe is arranged on the outer wall of the first guide pipe leg; a first flower piece which is mounted in the mounting pipe, and a second flower piece is mounted on the right side of the first flower piece; a second guide pipe leg which is arranged on the left side of the first flower piece; a supporting plate which arranged below the first guide pipe leg, and a mounting groove is formed in the outer wall of the supporting plate; an inner center truss which is arranged on the inner side of the supporting plate. The upper jacket for deepwater wind power is provided with the inner center truss, the design of a base supported by an integrated scaffold is considered, and the upper jacket has high-precision and reusable positioning and supporting, so that the process of repeatedly assembling and disassembling the scaffold can be reduced, and the practicability of the device in the using process is improved.
本发明公开了一种深水风电用上部导管架及建造工艺,涉及深水风电技术领域,具体为一种深水风电用上部导管架及建造工艺,深水风电用上部导管架包括第一导管腿,所述第一导管腿的外壁设置有安装管;第一花片,其安装在所述安装管的内部,所述第一花片的右侧安装有第二花片;第二导管腿,其设置在所述第一花片的左侧;支撑板,其设置在所述第一导管腿的下方,所述支撑板的外壁开设有安装槽;内中心衍架,其设置在所述支撑板的内侧。该深水风电用上部导管架设置有内中心衍架,兼顾了集成脚手架支撑的基座设计,具有高精度、可重复使用的定位及支撑,从而能够减少脚手架反复搭拆的过程,提高了装置在使用过程中的实用性。
Upper jacket for deepwater wind power and construction process
一种深水风电用上部导管架及建造工艺
ZHANG TING (author) / TIAN DAHE (author) / LI HUIMING (author) / LI MINGZHI (author) / AN KEFENG (author) / ZHANG CHANGFU (author)
2022-02-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Offshore wind power jacket foundation and construction process thereof
European Patent Office | 2022
|European Patent Office | 2023
|