A platform for research: civil engineering, architecture and urbanism
Hole-pile method station steel pipe column hoisting and fixing device and construction method
The invention relates to the technical field of construction engineering, in particular to a hole-pile method station steel pipe column hoisting and fixing device and a construction method. The hole pile method station steel pipe column hoisting and fixing device comprises a door-shaped frame and a derrick; the door-shaped frame is movably arranged in a pilot tunnel; a hoisting mechanism is arranged at the top of the door-shaped frame; the derrick is arranged in the pilot tunnel, a positioning opening is formed in the derrick, and the positioning opening is located above the wellhead; wherein the hoisting device is used for hoisting the steel pipe column and loading the steel pipe column into a well from the positioning opening. According to the device of the invention, rapid installation of the steel pipe column can be realized through the positioning port of the derrick, meanwhile, the installation precision can be ensured, the installation time of the steel pipe column is effectively shortened, and certain economical efficiency is achieved.
本公开涉及建设工程技术领域,尤其涉及一种洞桩法车站钢管柱吊装固定装置及施工方法。本公开提供的洞桩法车站钢管柱吊装固定装置包括门型架和井架:门型架可移动的设置于导洞,所述门型架的顶部设有起吊机构;井架设置于所述导洞,所述井架形成有定位口,所述定位口位于井口的上方;其中,所述起吊装置用于将钢管柱吊起并从定位口装入井内。本公开实施例通过井架的定位口可以实现钢管柱的快速安装,同时又可以保证安装精度,有效减少了钢管柱的安装时间,具有一定的经济性。
Hole-pile method station steel pipe column hoisting and fixing device and construction method
The invention relates to the technical field of construction engineering, in particular to a hole-pile method station steel pipe column hoisting and fixing device and a construction method. The hole pile method station steel pipe column hoisting and fixing device comprises a door-shaped frame and a derrick; the door-shaped frame is movably arranged in a pilot tunnel; a hoisting mechanism is arranged at the top of the door-shaped frame; the derrick is arranged in the pilot tunnel, a positioning opening is formed in the derrick, and the positioning opening is located above the wellhead; wherein the hoisting device is used for hoisting the steel pipe column and loading the steel pipe column into a well from the positioning opening. According to the device of the invention, rapid installation of the steel pipe column can be realized through the positioning port of the derrick, meanwhile, the installation precision can be ensured, the installation time of the steel pipe column is effectively shortened, and certain economical efficiency is achieved.
本公开涉及建设工程技术领域,尤其涉及一种洞桩法车站钢管柱吊装固定装置及施工方法。本公开提供的洞桩法车站钢管柱吊装固定装置包括门型架和井架:门型架可移动的设置于导洞,所述门型架的顶部设有起吊机构;井架设置于所述导洞,所述井架形成有定位口,所述定位口位于井口的上方;其中,所述起吊装置用于将钢管柱吊起并从定位口装入井内。本公开实施例通过井架的定位口可以实现钢管柱的快速安装,同时又可以保证安装精度,有效减少了钢管柱的安装时间,具有一定的经济性。
Hole-pile method station steel pipe column hoisting and fixing device and construction method
洞桩法车站钢管柱吊装固定装置及施工方法
ZHAO LICAI (author) / LU JIANXUN (author) / HU ZONGCHENG (author)
2022-02-08
Patent
Electronic Resource
Chinese
Urban subway station steel pipe column construction method adopting hole-pile method
European Patent Office | 2021
|European Patent Office | 2020
|Hoisting device for hoisting central hollow hole prefabricated pile and construction method thereof
European Patent Office | 2020
|Metro station hole column middle side pile hole-forming construction method
European Patent Office | 2024
|