Steel column hoisting device, steel column hoisting construction method and steel column hoisting supervision method
The invention relates to the technical field of steel structure hoisting, in particular to a steel column hoisting device, a steel column hoisting construction method and a steel column hoisting supervision method. The steel column hoisting device comprises an operation platform, wherein a steel column penetrates through the center of the operation platform; the operation platform comprises a leftplatform and a right platform, wherein the left platform abuts against the right platform, and a connection component is arranged between the left platform and the right platform; and a safe ladder is arranged at the bottom end of the operation platform, the safe ladder is fixedly connected with the steel column, the position, corresponding to the safe ladder, of the left platform is provided with an inlet/outlet, and the inlet/outlet penetrates through the left platform. According to the steel column hoisting device, after the left platform and the right platform are fixed to the steel column through the connection component, the steel column is hoisted to the top end of a following steel column, then the steel column enters an operation platform of the following steel column through a safe ladder of the following steel column, construction on the butt-joint position of the steel column and the following steel column is performed on the operation platform of the following steel column, and therefore the device has the effect of shortening the construction period of the steel column in installation.
本发明涉及钢结构吊装的技术领域,尤其是涉及一种钢柱吊装装置及钢柱吊装施工方法以及其监理方法,其包括操作平台,钢柱穿过操作平台的中央,操作平台包括左平台和右平台,左平台和右平台抵接,左平台和右平台之间设置有连接组件,操作平台的底端设置有安全爬梯,安全爬梯与钢柱固定连接,左平台对应安全爬梯处开设有进出口,进出口贯穿左平台。本发明中,左平台和右平台通过连接组件与钢柱固定后,将钢柱吊运至下节钢柱的顶端,然后通过下节钢柱的安全爬梯进入下节钢柱的操作平台,在下节钢柱的操作平台进行钢柱与下节钢柱对接处的施工,具有缩短钢柱安装时的施工周期的效果。
Steel column hoisting device, steel column hoisting construction method and steel column hoisting supervision method
The invention relates to the technical field of steel structure hoisting, in particular to a steel column hoisting device, a steel column hoisting construction method and a steel column hoisting supervision method. The steel column hoisting device comprises an operation platform, wherein a steel column penetrates through the center of the operation platform; the operation platform comprises a leftplatform and a right platform, wherein the left platform abuts against the right platform, and a connection component is arranged between the left platform and the right platform; and a safe ladder is arranged at the bottom end of the operation platform, the safe ladder is fixedly connected with the steel column, the position, corresponding to the safe ladder, of the left platform is provided with an inlet/outlet, and the inlet/outlet penetrates through the left platform. According to the steel column hoisting device, after the left platform and the right platform are fixed to the steel column through the connection component, the steel column is hoisted to the top end of a following steel column, then the steel column enters an operation platform of the following steel column through a safe ladder of the following steel column, construction on the butt-joint position of the steel column and the following steel column is performed on the operation platform of the following steel column, and therefore the device has the effect of shortening the construction period of the steel column in installation.
本发明涉及钢结构吊装的技术领域,尤其是涉及一种钢柱吊装装置及钢柱吊装施工方法以及其监理方法,其包括操作平台,钢柱穿过操作平台的中央,操作平台包括左平台和右平台,左平台和右平台抵接,左平台和右平台之间设置有连接组件,操作平台的底端设置有安全爬梯,安全爬梯与钢柱固定连接,左平台对应安全爬梯处开设有进出口,进出口贯穿左平台。本发明中,左平台和右平台通过连接组件与钢柱固定后,将钢柱吊运至下节钢柱的顶端,然后通过下节钢柱的安全爬梯进入下节钢柱的操作平台,在下节钢柱的操作平台进行钢柱与下节钢柱对接处的施工,具有缩短钢柱安装时的施工周期的效果。
Steel column hoisting device, steel column hoisting construction method and steel column hoisting supervision method
一种钢柱吊装装置及钢柱吊装施工方法以及其监理方法
LIU JINGYU (author) / AN XUDONG (author) / GUAN YINGCHAO (author)
2020-07-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Steel column hoisting device and construction method thereof
European Patent Office | 2023
|Steel column hoisting positioning assistor and positioning method
European Patent Office | 2023
|