A platform for research: civil engineering, architecture and urbanism
Backfilling device for hole of concrete structure and blocking construction method
The invention discloses a backfilling device for a hole of a concrete structure and a blocking construction method and relates to the technical field of concrete structures. The backfilling device for the hole of the concrete structure comprises a plugging structural part, a grouting pipe and an exhaust pipe, wherein the plugging structural part is used for plugging the hole, a first end of the grouting pipe and a first end of the exhaust pipe are both located outside the hole, and a second end of the grouting pipe and a second end of the exhaust pipe both penetrate through the plugging structural part to stretch into the hole; the second end of the exhaust pipe is used for extending to the highest position of the hole. The device is advantaged in that a problem that it is difficult to guarantee whether holes of a concrete structure are backfilled compactly or not in the prior art can be solved.
本申请公开一种混凝土结构的孔洞用回填装置及封堵施工方法,涉及混凝土结构技术领域。所公开的混凝土结构的孔洞用回填装置包括封堵结构件、注浆管和排气管,封堵结构件用于封堵孔洞,注浆管的第一端和排气管的第一端均位于孔洞之外,注浆管的第二端和排气管的第二端均穿过封堵结构件伸入孔洞内,且排气管的第二端用于伸至孔洞的最高位置。本申请能够解决相关技术中,难以保证混凝土结构的孔洞是否回填密实的问题。
Backfilling device for hole of concrete structure and blocking construction method
The invention discloses a backfilling device for a hole of a concrete structure and a blocking construction method and relates to the technical field of concrete structures. The backfilling device for the hole of the concrete structure comprises a plugging structural part, a grouting pipe and an exhaust pipe, wherein the plugging structural part is used for plugging the hole, a first end of the grouting pipe and a first end of the exhaust pipe are both located outside the hole, and a second end of the grouting pipe and a second end of the exhaust pipe both penetrate through the plugging structural part to stretch into the hole; the second end of the exhaust pipe is used for extending to the highest position of the hole. The device is advantaged in that a problem that it is difficult to guarantee whether holes of a concrete structure are backfilled compactly or not in the prior art can be solved.
本申请公开一种混凝土结构的孔洞用回填装置及封堵施工方法,涉及混凝土结构技术领域。所公开的混凝土结构的孔洞用回填装置包括封堵结构件、注浆管和排气管,封堵结构件用于封堵孔洞,注浆管的第一端和排气管的第一端均位于孔洞之外,注浆管的第二端和排气管的第二端均穿过封堵结构件伸入孔洞内,且排气管的第二端用于伸至孔洞的最高位置。本申请能够解决相关技术中,难以保证混凝土结构的孔洞是否回填密实的问题。
Backfilling device for hole of concrete structure and blocking construction method
混凝土结构的孔洞用回填装置及封堵施工方法
XU RENHU (author) / ZHENG TIANYAN (author) / FAN QINGLIANG (author) / ZHANG QIANG (author) / PANG MIAO (author) / ZHANG YONGQIANG (author) / SONG GUANGYUAN (author)
2022-02-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Single-point settlement monitoring hole backfilling device and backfilling method
European Patent Office | 2023
|Foam concrete backfilling fertilizer groove construction method
European Patent Office | 2024
|European Patent Office | 2022
|Anti-blocking earthwork backfilling and compacting device for water conservancy construction
European Patent Office | 2022
|