A platform for research: civil engineering, architecture and urbanism
Bonded prestressed beam construction process
The invention relates to a bonded prestressed beam construction process. The bonded prestressed beam construction process comprises the following steps of S1, construction preparation, S11, laying a non-prestressed rib framework and non-prestressed ribs; S12, preparing an end mold; S13, preparing an erection rib; S14, pre-stressed tendons being prepared; S2, laying of prestressed tendons, S21, mounting of erection tendons; S22, laying a bonded corrugated pipe; S23, mounting an exhaust hole; S24, tensioning end nodes being installed; S25, penetrating prestressed tendons; S26, closing a template; S27, concrete being poured; S3, tensioning the prestressed tendons; S4, grouting of the prestressed duct; and S5, a prestress tensioning end being blocked. The bonded prestressed beam construction process is reasonable in design, excellent in structural performance, excellent in anti-seismic performance and simple in construction process, and the quality is easy to control.
本发明涉及一种有粘结预应力梁施工工艺,包括:步骤S1,施工准备,包括:步骤S11,铺设非预应力筋骨架以及非预应力筋;步骤S12,准备端模;步骤S13,准备架立筋;步骤S14,准备预应力筋;步骤S2,铺放预应力筋,包括:步骤S21,安装架立筋;步骤S22,铺设有粘结波纹管;步骤S23,安装排气孔;步骤S24,安装张拉端节点;步骤S25,穿预应力筋;步骤S26,合模板;步骤S27,浇筑混凝土;步骤S3,预应力筋的张拉;步骤S4,预应力孔道的灌浆;步骤S5,预应力张拉端的封堵。本发明有粘结预应力梁施工工艺设计合理,结构性能优异、抗震性能优、施工工艺简单、质量易于控制。
Bonded prestressed beam construction process
The invention relates to a bonded prestressed beam construction process. The bonded prestressed beam construction process comprises the following steps of S1, construction preparation, S11, laying a non-prestressed rib framework and non-prestressed ribs; S12, preparing an end mold; S13, preparing an erection rib; S14, pre-stressed tendons being prepared; S2, laying of prestressed tendons, S21, mounting of erection tendons; S22, laying a bonded corrugated pipe; S23, mounting an exhaust hole; S24, tensioning end nodes being installed; S25, penetrating prestressed tendons; S26, closing a template; S27, concrete being poured; S3, tensioning the prestressed tendons; S4, grouting of the prestressed duct; and S5, a prestress tensioning end being blocked. The bonded prestressed beam construction process is reasonable in design, excellent in structural performance, excellent in anti-seismic performance and simple in construction process, and the quality is easy to control.
本发明涉及一种有粘结预应力梁施工工艺,包括:步骤S1,施工准备,包括:步骤S11,铺设非预应力筋骨架以及非预应力筋;步骤S12,准备端模;步骤S13,准备架立筋;步骤S14,准备预应力筋;步骤S2,铺放预应力筋,包括:步骤S21,安装架立筋;步骤S22,铺设有粘结波纹管;步骤S23,安装排气孔;步骤S24,安装张拉端节点;步骤S25,穿预应力筋;步骤S26,合模板;步骤S27,浇筑混凝土;步骤S3,预应力筋的张拉;步骤S4,预应力孔道的灌浆;步骤S5,预应力张拉端的封堵。本发明有粘结预应力梁施工工艺设计合理,结构性能优异、抗震性能优、施工工艺简单、质量易于控制。
Bonded prestressed beam construction process
一种有粘结预应力梁施工工艺
LI QI (author) / LIU HAIYANG (author) / LIU YUE (author) / HU HUOSHENG (author) / LI YIN (author) / LYU ZHUO (author)
2022-02-18
Patent
Electronic Resource
Chinese
Bonded prestressed construction process for skirt room frame beam construction
European Patent Office | 2021
|Large-span concrete beam retard-bonded prestressed construction method
European Patent Office | 2021
|Construction method of large-diameter retard-bonded prestressed beam
European Patent Office | 2023
|Comparison between Unbonded Prestressed Frame Beam and Bonded Prestressed Frame Beam
British Library Conference Proceedings | 2005
|Method for dismantling post-tensioned bonded prestressed beam
European Patent Office | 2023
|