Construction method for improving mounting qualification rate of water stop steel plate
The invention particularly relates to a construction method for improving the mounting qualification rate of water stop steel plates. Comprising the following steps: 1, positioning a waterstop steel plate; step 2, placing a water stop steel plate; step 3, placing a water stop steel plate at a special part; fourthly, pouring is conducted; and after the water stop steel plate is placed, concrete pouring is conducted, and in the pouring process, the recyclable clamping grooves are taken out for cyclic utilization. Compared with a traditional construction method, the water stop steel plate construction method has the following advantages that 1, the water stop steel plate clamping groove can be manufactured in advance through steel bar excess materials, and the outer clamping groove can be reused after concrete pouring is completed and detached; construction is greatly reduced, the finished water stop steel plate can be machined in advance in a temporary factory, the construction period is not occupied, and the construction speed of the water stop steel plate at the corner is 40% higher than that of a traditional on-site welding method;
本发明具体是一种提高止水钢板安装合格率的施工方法;包括步骤1、止水钢板定位;步骤2、止水钢板放置;步骤3、特殊部位止水钢板放置;步骤四4、浇筑;将止水钢板放置后进行混凝土浇筑,在浇筑过程中,取出可循环利用卡槽,进行循环利用。本发明所提出的止水钢板施工方法较传统施工方法有以下优点:1、止水钢板卡槽采用钢筋余料可提前制作,外卡槽在混凝土浇筑完成拆卸后可重复利用。2、大大减低施工,成品止水钢板可在临时工厂提前加工,不占用工期,转角处止水钢板施工速度对比传统的现场焊接方法快40%。
Construction method for improving mounting qualification rate of water stop steel plate
The invention particularly relates to a construction method for improving the mounting qualification rate of water stop steel plates. Comprising the following steps: 1, positioning a waterstop steel plate; step 2, placing a water stop steel plate; step 3, placing a water stop steel plate at a special part; fourthly, pouring is conducted; and after the water stop steel plate is placed, concrete pouring is conducted, and in the pouring process, the recyclable clamping grooves are taken out for cyclic utilization. Compared with a traditional construction method, the water stop steel plate construction method has the following advantages that 1, the water stop steel plate clamping groove can be manufactured in advance through steel bar excess materials, and the outer clamping groove can be reused after concrete pouring is completed and detached; construction is greatly reduced, the finished water stop steel plate can be machined in advance in a temporary factory, the construction period is not occupied, and the construction speed of the water stop steel plate at the corner is 40% higher than that of a traditional on-site welding method;
本发明具体是一种提高止水钢板安装合格率的施工方法;包括步骤1、止水钢板定位;步骤2、止水钢板放置;步骤3、特殊部位止水钢板放置;步骤四4、浇筑;将止水钢板放置后进行混凝土浇筑,在浇筑过程中,取出可循环利用卡槽,进行循环利用。本发明所提出的止水钢板施工方法较传统施工方法有以下优点:1、止水钢板卡槽采用钢筋余料可提前制作,外卡槽在混凝土浇筑完成拆卸后可重复利用。2、大大减低施工,成品止水钢板可在临时工厂提前加工,不占用工期,转角处止水钢板施工速度对比传统的现场焊接方法快40%。
Construction method for improving mounting qualification rate of water stop steel plate
一种提高止水钢板安装合格率的施工方法
SONG TIANSHUAI (author) / HE RAN (author) / HE JUN (author) / XIAN QINGJI (author) / MA TONGJI (author) / DONG YANHUI (author) / ZHAN SHENG (author)
2022-03-11
Patent
Electronic Resource
Chinese
Water stop steel plate mounting device and construction method
European Patent Office | 2022
|Quick mounting device for water stop steel plate and using method
European Patent Office | 2024
|Construction method for improving mounting quality of color steel plate
European Patent Office | 2023
|Construction structure and construction method of construction joint water stop steel plate
European Patent Office | 2023
|Vertical steel edge water stop belt and horizontal water stop steel plate joint construction device
European Patent Office | 2023
|