A platform for research: civil engineering, architecture and urbanism
Construction method for improving mounting quality of color steel plate
The invention discloses a construction method for improving the installation quality of a color steel plate. The construction method comprises the following steps that an elevated platform is erected, and the elevated platform can walk on one side outside a greenhouse; and a rolling mill is arranged on the elevated platform. An uncoiler is arranged on the ground or an elevated platform. And the rolled color steel plate is conveyed to a rolling mill through an uncoiler. The color steel plate sent by the rolling mill is sent to the roof, and after the color steel plate sent by the rolling mill reaches the designed length, the color steel plate is cut off through the rolling mill. And conveying the color steel plate cut off by the rolling machine to a mounting position on the roof. The color steel plate at the installation position is fixed to the special fixing support at the installation position and is fixed to another color steel plate at the installation position, and installation of the color steel plates is achieved. According to the method, the long color steel plates can be conveyed to the roof, splicing of the color steel plates is reduced, the water leakage and seepage phenomena are reduced, the color steel plates are in the optimal use state, the maintenance frequency can be effectively reduced, the maintenance cost is reduced, the installation reliability of the color steel plates is improved, and the service life of the color steel plates is prolonged.
本申请公开了一种提高彩钢板安装质量的施工方法,包括以下步骤:架设高架平台,高架平台可行走于大棚棚外一侧。在高架平台上设置轧机。在地面或高架平台上设置开卷机。将收卷的彩钢板通过开卷机送至轧机处。将轧机送出的所彩钢板送至屋面上,轧机送出的彩钢板达到设计长度后,采用轧机将彩钢板截断。将扎机截断的彩钢板送至屋面上的安装位置。将安装位置处的彩钢板与安装位置处的专用固定支架固定,并与安装位置处的另一彩钢板固定,实现彩钢板的安装。本申请的方法可以将较长的彩钢板送至屋面上,减少彩钢板的拼接,减少漏水、渗水现象,使彩钢板为最佳使用状态,可以有效减少维修次数,降低维修费用,提高彩钢板的安装可靠性和使用寿命。
Construction method for improving mounting quality of color steel plate
The invention discloses a construction method for improving the installation quality of a color steel plate. The construction method comprises the following steps that an elevated platform is erected, and the elevated platform can walk on one side outside a greenhouse; and a rolling mill is arranged on the elevated platform. An uncoiler is arranged on the ground or an elevated platform. And the rolled color steel plate is conveyed to a rolling mill through an uncoiler. The color steel plate sent by the rolling mill is sent to the roof, and after the color steel plate sent by the rolling mill reaches the designed length, the color steel plate is cut off through the rolling mill. And conveying the color steel plate cut off by the rolling machine to a mounting position on the roof. The color steel plate at the installation position is fixed to the special fixing support at the installation position and is fixed to another color steel plate at the installation position, and installation of the color steel plates is achieved. According to the method, the long color steel plates can be conveyed to the roof, splicing of the color steel plates is reduced, the water leakage and seepage phenomena are reduced, the color steel plates are in the optimal use state, the maintenance frequency can be effectively reduced, the maintenance cost is reduced, the installation reliability of the color steel plates is improved, and the service life of the color steel plates is prolonged.
本申请公开了一种提高彩钢板安装质量的施工方法,包括以下步骤:架设高架平台,高架平台可行走于大棚棚外一侧。在高架平台上设置轧机。在地面或高架平台上设置开卷机。将收卷的彩钢板通过开卷机送至轧机处。将轧机送出的所彩钢板送至屋面上,轧机送出的彩钢板达到设计长度后,采用轧机将彩钢板截断。将扎机截断的彩钢板送至屋面上的安装位置。将安装位置处的彩钢板与安装位置处的专用固定支架固定,并与安装位置处的另一彩钢板固定,实现彩钢板的安装。本申请的方法可以将较长的彩钢板送至屋面上,减少彩钢板的拼接,减少漏水、渗水现象,使彩钢板为最佳使用状态,可以有效减少维修次数,降低维修费用,提高彩钢板的安装可靠性和使用寿命。
Construction method for improving mounting quality of color steel plate
一种提高彩钢板安装质量的施工方法
FU YU (author) / FENG RU (author) / LIU HAIBO (author) / WEN YONGQIANG (author) / LIU RUNQING (author)
2023-08-18
Patent
Electronic Resource
Chinese
Construction method for improving mounting qualification rate of water stop steel plate
European Patent Office | 2022
|Auxiliary mounting device and mounting method of rock wool sandwich color steel plate
European Patent Office | 2024
|Method for mounting PU composite color steel plate on ceiling
European Patent Office | 2021
|