Non-dismantling formwork shear wall
The invention discloses a non-dismantling formwork shear wall, and belongs to the technical field of building structures. Connecting blocks and the manufactured steel bar forming product are fixedly connected through steel bar notches, meanwhile, connecting rods are installed on screw threads and fastened, then high-precision non-dismantling formworks are attached to the two sides of the steel bar forming product, self-tapping screws are anchored into fixed holes in the surfaces of the formworks, the self-tapping screws are anchored into the connecting blocks, and the high-precision non-dismantling formworks are connected with the connecting blocks. And the assembly of the non-dismantling formwork shear wall is completed. After the assembled non-dismantling formwork shear wall is transported to a construction site, hoisting and reinforcing are carried out, concrete pouring is carried out on site, and after proper adjustment is carried out, high-precision non-dismantling formworks on the single side of the non-dismantling formwork shear wall are reserved, and an insulation board is installed on the other side of the non-dismantling formwork shear wall, the non-dismantling formwork shear wall can also be used for a building insulation outer wall. In the construction process of an assembly type building, installation is convenient, meanwhile, the whole component is simple in structure, the manufacturing cost is low, large-scale popularization is facilitated, the construction difficulty is small, and structural safety is facilitated.
本发明公开了一种免拆模板剪力墙,属于建筑结构技术领域。将连接块与制作完成的钢筋成型制品通过钢筋槽口进行连接固定,同时将连接杆安装在螺丝丝扣上并紧固,随后在钢筋成型制品两侧附上高精度免拆模板,在模板表面定孔锚入自攻螺钉,自攻螺钉锚入连接块内,则免拆模板剪力墙组装完成。将组装完成的免拆模板剪力墙运至施工现场后,进行吊装并加固,现场进行混凝土浇筑,在进行适当的调整,即保留免拆模板剪力墙单侧高精度免拆模板、另一侧安装保温板后,也可用于建筑保温外墙,通过以上安装连接方式,在装配式建筑的施工过程中,本发明安装方便,同时整个构件结构简单,制造成本较低,便于大规模普及,施工难度小且利于结构安全。
Non-dismantling formwork shear wall
The invention discloses a non-dismantling formwork shear wall, and belongs to the technical field of building structures. Connecting blocks and the manufactured steel bar forming product are fixedly connected through steel bar notches, meanwhile, connecting rods are installed on screw threads and fastened, then high-precision non-dismantling formworks are attached to the two sides of the steel bar forming product, self-tapping screws are anchored into fixed holes in the surfaces of the formworks, the self-tapping screws are anchored into the connecting blocks, and the high-precision non-dismantling formworks are connected with the connecting blocks. And the assembly of the non-dismantling formwork shear wall is completed. After the assembled non-dismantling formwork shear wall is transported to a construction site, hoisting and reinforcing are carried out, concrete pouring is carried out on site, and after proper adjustment is carried out, high-precision non-dismantling formworks on the single side of the non-dismantling formwork shear wall are reserved, and an insulation board is installed on the other side of the non-dismantling formwork shear wall, the non-dismantling formwork shear wall can also be used for a building insulation outer wall. In the construction process of an assembly type building, installation is convenient, meanwhile, the whole component is simple in structure, the manufacturing cost is low, large-scale popularization is facilitated, the construction difficulty is small, and structural safety is facilitated.
本发明公开了一种免拆模板剪力墙,属于建筑结构技术领域。将连接块与制作完成的钢筋成型制品通过钢筋槽口进行连接固定,同时将连接杆安装在螺丝丝扣上并紧固,随后在钢筋成型制品两侧附上高精度免拆模板,在模板表面定孔锚入自攻螺钉,自攻螺钉锚入连接块内,则免拆模板剪力墙组装完成。将组装完成的免拆模板剪力墙运至施工现场后,进行吊装并加固,现场进行混凝土浇筑,在进行适当的调整,即保留免拆模板剪力墙单侧高精度免拆模板、另一侧安装保温板后,也可用于建筑保温外墙,通过以上安装连接方式,在装配式建筑的施工过程中,本发明安装方便,同时整个构件结构简单,制造成本较低,便于大规模普及,施工难度小且利于结构安全。
Non-dismantling formwork shear wall
一种免拆模板剪力墙
LI YANKUAN (author) / ZHANG YONGZHI (author) / MA HONG (author) / XING JIANTAO (author) / QIN HAO (author)
2022-03-29
Patent
Electronic Resource
Chinese
Shear wall non-dismantling formwork and production method thereof
European Patent Office | 2021
|Silicon-based ceramic non-dismantling formwork shear wall and shear wall construction technology
European Patent Office | 2023
|Fabricated concrete shear wall structure non-dismantling formwork system construction method
European Patent Office | 2023
|