A platform for research: civil engineering, architecture and urbanism
Space grid ultra-large span bolt-sphere assembly based on bolt-sphere
The invention relates to the technical field of space grids, in particular to a space grid ultra-large-span bolt-sphere assembly based on bolt-spheres. Tangent planes are arranged on the surfaces of the bolt-spheres, sleeves are arranged on the outer sides of the tangent planes, steel pipes are arranged on the outer sides of the sleeves, and the steel pipes are fixedly connected with the bolt-spheres through high-strength bolts; the high-strength bolt penetrates through the interior of the sleeve, the high-strength bolt is fixedly connected with the sleeve through the fastening screw, threaded holes are formed in the tangent plane surface of the bolt ball and correspond to the high-strength bolt, threaded holes are formed in the surface of the sleeve and correspond to the fastening screw, and a conical head or a sealing plate is arranged at the front end of the steel pipe. According to the invention, the problems of design, processing, production and installation of domestic and international 200-600m bolt-sphere net racks can be solved, the major development of the space structure net rack industry can be greatly promoted, the bottleneck problem of ultra-large span is solved, and the method has industrial milestone significance.
本发明涉及空间网架技术领域,尤其为基于螺栓球的空间网格超大跨度螺栓球组件,所述螺栓球的表面均设置有切面,所述切面的外侧设置有套筒,所述套筒的外侧设置有钢管,所述钢管通过高强螺栓与螺栓球固定连接,所述高强螺栓贯穿于套筒的内部,所述高强螺栓通过紧固螺钉与套筒固定连接,所述螺栓球的切面表面且与高强螺栓相对应位置和套筒的表面且与紧固螺钉相对应位置均设置有螺纹孔,所述钢管的前端设置有锥头或封板,本发明提供了一种可以解决国内及国际200‑600米螺栓球网架的设计,加工生产安装问题,可以极大的促进空间结构网架这个行业的大发展,解决超大跨度的瓶颈问题,具有行业里程碑意义。
Space grid ultra-large span bolt-sphere assembly based on bolt-sphere
The invention relates to the technical field of space grids, in particular to a space grid ultra-large-span bolt-sphere assembly based on bolt-spheres. Tangent planes are arranged on the surfaces of the bolt-spheres, sleeves are arranged on the outer sides of the tangent planes, steel pipes are arranged on the outer sides of the sleeves, and the steel pipes are fixedly connected with the bolt-spheres through high-strength bolts; the high-strength bolt penetrates through the interior of the sleeve, the high-strength bolt is fixedly connected with the sleeve through the fastening screw, threaded holes are formed in the tangent plane surface of the bolt ball and correspond to the high-strength bolt, threaded holes are formed in the surface of the sleeve and correspond to the fastening screw, and a conical head or a sealing plate is arranged at the front end of the steel pipe. According to the invention, the problems of design, processing, production and installation of domestic and international 200-600m bolt-sphere net racks can be solved, the major development of the space structure net rack industry can be greatly promoted, the bottleneck problem of ultra-large span is solved, and the method has industrial milestone significance.
本发明涉及空间网架技术领域,尤其为基于螺栓球的空间网格超大跨度螺栓球组件,所述螺栓球的表面均设置有切面,所述切面的外侧设置有套筒,所述套筒的外侧设置有钢管,所述钢管通过高强螺栓与螺栓球固定连接,所述高强螺栓贯穿于套筒的内部,所述高强螺栓通过紧固螺钉与套筒固定连接,所述螺栓球的切面表面且与高强螺栓相对应位置和套筒的表面且与紧固螺钉相对应位置均设置有螺纹孔,所述钢管的前端设置有锥头或封板,本发明提供了一种可以解决国内及国际200‑600米螺栓球网架的设计,加工生产安装问题,可以极大的促进空间结构网架这个行业的大发展,解决超大跨度的瓶颈问题,具有行业里程碑意义。
Space grid ultra-large span bolt-sphere assembly based on bolt-sphere
基于螺栓球的空间网格超大跨度螺栓球组件
ZHANG SHAOTIAN (author) / CHANG HONG (author) / XIE JIAN (author)
2022-04-01
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method of large-span columnar bolt-sphere joint grid
European Patent Office | 2022
|Bolt-sphere joint broken repair connecting device and bolt-sphere assembly
European Patent Office | 2023
|Large-span bolt-sphere net rack gable wall mounting method
European Patent Office | 2023
|High-strength bolt reconnection device of bolt-sphere grid structure
European Patent Office | 2022
|