Large-span bolt-sphere net rack gable wall mounting method
The invention belongs to the field of buildings, and relates to a method for installing a large-span bolt-sphere net rack gable, which comprises the following steps of: integrally hoisting two grids of a vertical inner chord and one grid of an outer chord when the gable is started to be installed, dividing the gable into four sections during installation, respectively taking two grids on two sides as one section and taking 8-10 transverse grids in the middle as one section, and assembling on the ground in sections, and the net rack above the starting section is mounted in a scattered splicing manner until all the gable walls are mounted. When the large-span gable net rack is constructed, the gable net rack is assembled in a manner of combining starting segmented assembly and layer-by-layer scattered assembly of the net rack, a crane is used for matched installation, a scaffold does not need to be erected, and the operation is relatively simple and convenient, so that the labor efficiency is greatly improved, and the installation quality of the net rack is ensured.
本发明属于建筑领域,涉及一种大跨度螺栓球网架山墙安装方法,山墙起步安装时,以竖向内弦两个网格,外弦一个网格进行整体吊装,安装时共分为四段,两边各以两个网格为一段,中间横向8~10个网格为一段,先在地面分段拼装后,再用吊车配合整体吊装就位,起步段以上网架安装采用散拼安装,直至山墙全部安装完成。本发明在大跨度山墙网架施工时,通过网架起步分段拼装和逐层散拼相结合的方式完成山墙网架拼装,利用吊车配合安装,无需搭设脚手架,操作比较简便,从而大大提高了劳动效率,保证了网架安装质量。
Large-span bolt-sphere net rack gable wall mounting method
The invention belongs to the field of buildings, and relates to a method for installing a large-span bolt-sphere net rack gable, which comprises the following steps of: integrally hoisting two grids of a vertical inner chord and one grid of an outer chord when the gable is started to be installed, dividing the gable into four sections during installation, respectively taking two grids on two sides as one section and taking 8-10 transverse grids in the middle as one section, and assembling on the ground in sections, and the net rack above the starting section is mounted in a scattered splicing manner until all the gable walls are mounted. When the large-span gable net rack is constructed, the gable net rack is assembled in a manner of combining starting segmented assembly and layer-by-layer scattered assembly of the net rack, a crane is used for matched installation, a scaffold does not need to be erected, and the operation is relatively simple and convenient, so that the labor efficiency is greatly improved, and the installation quality of the net rack is ensured.
本发明属于建筑领域,涉及一种大跨度螺栓球网架山墙安装方法,山墙起步安装时,以竖向内弦两个网格,外弦一个网格进行整体吊装,安装时共分为四段,两边各以两个网格为一段,中间横向8~10个网格为一段,先在地面分段拼装后,再用吊车配合整体吊装就位,起步段以上网架安装采用散拼安装,直至山墙全部安装完成。本发明在大跨度山墙网架施工时,通过网架起步分段拼装和逐层散拼相结合的方式完成山墙网架拼装,利用吊车配合安装,无需搭设脚手架,操作比较简便,从而大大提高了劳动效率,保证了网架安装质量。
Large-span bolt-sphere net rack gable wall mounting method
大跨度螺栓球网架山墙安装方法
YAO JIANFANG (author) / HAN JIANPING (author) / TONG YE (author) / ZENG ZHIYUAN (author) / LI ZHILONG (author) / MA QIANG (author) / FENG HAILING (author)
2023-05-05
Patent
Electronic Resource
Chinese
Bolt ball lifting appliance for large-span asymmetric net rack and net rack mounting method
European Patent Office | 2020
|Large-span bolt-sphere net rack support in strong wind area and net rack structure
European Patent Office | 2024
|