A platform for research: civil engineering, architecture and urbanism
Construction method of movable anchoring steel plate ground wall guide wall
The invention relates to a construction method for a movable anchoring steel plate ground wall guide wall. The construction method comprises the following steps that (1) a ground fixing plate is arranged in advance and fixed; (2) an excavation groove used for lowering a soil retaining plate is excavated in the excavation direction of the preset ground wall; (3) a soil retaining plate is lowered into the excavated groove, the soil retaining plate is made to be tightly attached to the wall of the excavated groove, and the soil retaining plate is fixedly connected with the ground fixing plate; (4) the steps (1)-(3) are repeated, after the requirements are met, a ground wall groove is excavated along the pre-designed ground wall position, and after excavation is completed, a reinforcement cage is put down, and a ground wall is poured; and (5) removing the soil retaining plate and the ground fixing plate. The method is applied to foundation pit engineering, the movable anchoring steel plate ground wall guide wall is developed, the ground wall is rapidly excavated, and the method has important significance on rapid construction.
本发明涉及一种可移动的锚固钢板地墙导墙施工方法,包括以下步骤:(1)预先布置地面固定板并进行固定;(2)沿预设地墙开挖方向开挖用于下放挡土板的开挖沟槽;(3)下放挡土板至开挖沟槽内,使挡土板紧贴开挖沟槽壁,并将挡土板与地面固定板固定连接;(4)重复步骤(1)~(3),达到要求后,沿预先设计的地墙位置开挖地墙沟槽,开挖好后,下入钢筋笼,浇筑地墙;(5)拆除挡土板及地面固定板。本发明运用于基坑工程,开发可移动的锚固钢板地墙导墙,快速开挖地墙,对快速施工有着重要意义。
Construction method of movable anchoring steel plate ground wall guide wall
The invention relates to a construction method for a movable anchoring steel plate ground wall guide wall. The construction method comprises the following steps that (1) a ground fixing plate is arranged in advance and fixed; (2) an excavation groove used for lowering a soil retaining plate is excavated in the excavation direction of the preset ground wall; (3) a soil retaining plate is lowered into the excavated groove, the soil retaining plate is made to be tightly attached to the wall of the excavated groove, and the soil retaining plate is fixedly connected with the ground fixing plate; (4) the steps (1)-(3) are repeated, after the requirements are met, a ground wall groove is excavated along the pre-designed ground wall position, and after excavation is completed, a reinforcement cage is put down, and a ground wall is poured; and (5) removing the soil retaining plate and the ground fixing plate. The method is applied to foundation pit engineering, the movable anchoring steel plate ground wall guide wall is developed, the ground wall is rapidly excavated, and the method has important significance on rapid construction.
本发明涉及一种可移动的锚固钢板地墙导墙施工方法,包括以下步骤:(1)预先布置地面固定板并进行固定;(2)沿预设地墙开挖方向开挖用于下放挡土板的开挖沟槽;(3)下放挡土板至开挖沟槽内,使挡土板紧贴开挖沟槽壁,并将挡土板与地面固定板固定连接;(4)重复步骤(1)~(3),达到要求后,沿预先设计的地墙位置开挖地墙沟槽,开挖好后,下入钢筋笼,浇筑地墙;(5)拆除挡土板及地面固定板。本发明运用于基坑工程,开发可移动的锚固钢板地墙导墙,快速开挖地墙,对快速施工有着重要意义。
Construction method of movable anchoring steel plate ground wall guide wall
一种可移动的锚固钢板地墙导墙施工方法
WANG JIANXIU (author) / LI-HU BOQIANG (author) / WU FAN (author) / LIU XIAOTIAN (author) / HE QIANQIAN (author) / XUE RUI (author) / SU YUXIN (author) / SUN YUANWEI (author) / CAO ANSHENG (author) / LONG YANXIA (author)
2022-04-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Bidirectional anchoring plate retaining wall and construction method thereof
European Patent Office | 2024
|Steel guide wall for underground continuous wall and construction method of steel guide wall
European Patent Office | 2021
|European Patent Office | 2022
|Guide wall construction method and guide wall construction structure
European Patent Office | 2020
|