Unit type supporting and early-dismantling formwork system construction method
The invention belongs to the technical field of building construction, and particularly relates to a unit type supporting and early-dismantling formwork system construction method which comprises the following steps that unit frame bodies are built, and the intervals of multiple sets of unit frame bodies are arranged according to design specifications; s2, horizontal keels are erected on the unit frame bodies erected in the step S1, and secondary keels and formworks are sequentially placed on the horizontal keels; an overturning base is installed at the top of the horizontal keel fixed to the unit frame body in the step S2; based on an existing construction mode and fully considering the problem that the construction cost is increased due to the existing construction mode, the novel formwork and scaffold construction technology is adopted, so that frame body materials needed by cast-in-place concrete slabs of the same scale can be effectively reduced by 30% compared with a traditional construction technology; the template and the primary and secondary keels can be turned over by more than 90%, so that the economic benefit of a frame body material is improved to a certain extent.
本发明属于建筑施工技术领域,具体的说是一种单元式支撑与早拆模板体系施工工法,该工法包括以下步骤:搭建单元架体,多组单元架体的间距根据设计规范布置;在步骤S1搭建的单元架体上架设水平龙骨,并于水平龙骨上依次放置次龙骨以及模板;于步骤S2固定于单元架体上的水平龙骨顶部安装翻转基座;本发明基于现有的施工方式,以及充分考虑现有施工方式所导致的施工成本上升问题,采用新的模板与脚手架施工工艺,使得相同规模的现浇混凝土板所需要的架体材料对比传统施工工艺可有效降低30%,同时本发明的施工工艺,模板及主次龙骨可实现90%以上周转,在一定程度上提高架体材料的经济效益。
Unit type supporting and early-dismantling formwork system construction method
The invention belongs to the technical field of building construction, and particularly relates to a unit type supporting and early-dismantling formwork system construction method which comprises the following steps that unit frame bodies are built, and the intervals of multiple sets of unit frame bodies are arranged according to design specifications; s2, horizontal keels are erected on the unit frame bodies erected in the step S1, and secondary keels and formworks are sequentially placed on the horizontal keels; an overturning base is installed at the top of the horizontal keel fixed to the unit frame body in the step S2; based on an existing construction mode and fully considering the problem that the construction cost is increased due to the existing construction mode, the novel formwork and scaffold construction technology is adopted, so that frame body materials needed by cast-in-place concrete slabs of the same scale can be effectively reduced by 30% compared with a traditional construction technology; the template and the primary and secondary keels can be turned over by more than 90%, so that the economic benefit of a frame body material is improved to a certain extent.
本发明属于建筑施工技术领域,具体的说是一种单元式支撑与早拆模板体系施工工法,该工法包括以下步骤:搭建单元架体,多组单元架体的间距根据设计规范布置;在步骤S1搭建的单元架体上架设水平龙骨,并于水平龙骨上依次放置次龙骨以及模板;于步骤S2固定于单元架体上的水平龙骨顶部安装翻转基座;本发明基于现有的施工方式,以及充分考虑现有施工方式所导致的施工成本上升问题,采用新的模板与脚手架施工工艺,使得相同规模的现浇混凝土板所需要的架体材料对比传统施工工艺可有效降低30%,同时本发明的施工工艺,模板及主次龙骨可实现90%以上周转,在一定程度上提高架体材料的经济效益。
Unit type supporting and early-dismantling formwork system construction method
一种单元式支撑与早拆模板体系施工工法
WEN KE (author) / FEI XIAYAN (author) / LING CHENG (author) / YI SIHANG (author) / LAI HAILIN (author)
2022-04-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|European Patent Office | 2023
|European Patent Office | 2023
|