A platform for research: civil engineering, architecture and urbanism
Post-cast strip construction method
According to the post-cast strip construction method, an adjustable supporting column is included, the supporting column comprises a first support and a second support, the first support and the second support are each of a square pipe structure, the first support and the second support are fixedly connected through a bolt, and a first positioning hole and a second positioning hole at the proper position can be selected according to needs; therefore, the overall height of the supporting column is adjusted. The supporting column is simple in structure, convenient to install and capable of being used repeatedly, the construction cost is reduced, and the construction efficiency is improved; the overall length of the supporting column is adjustable, supporting force can be provided for post-cast strips of different heights, and cracks are avoided.
本发明公开了一种后浇带的施工方法,包括可调节的支撑柱,该支撑柱包括第一支架和第二支架,第一支架、第二支架均为方形管结构,第一支架和第二支架通过螺栓固定连接,可以根据需要选择合适位置的第一定位孔与第二定位孔,从而调整支撑柱整体的高度。本发明中的支撑柱结构简单、安装方便,可多次周转使用,降低施工成本,提高施工效率;支撑柱整体长度可调,可对不同高度的后浇带提供支撑力,避免裂缝的发生。
Post-cast strip construction method
According to the post-cast strip construction method, an adjustable supporting column is included, the supporting column comprises a first support and a second support, the first support and the second support are each of a square pipe structure, the first support and the second support are fixedly connected through a bolt, and a first positioning hole and a second positioning hole at the proper position can be selected according to needs; therefore, the overall height of the supporting column is adjusted. The supporting column is simple in structure, convenient to install and capable of being used repeatedly, the construction cost is reduced, and the construction efficiency is improved; the overall length of the supporting column is adjustable, supporting force can be provided for post-cast strips of different heights, and cracks are avoided.
本发明公开了一种后浇带的施工方法,包括可调节的支撑柱,该支撑柱包括第一支架和第二支架,第一支架、第二支架均为方形管结构,第一支架和第二支架通过螺栓固定连接,可以根据需要选择合适位置的第一定位孔与第二定位孔,从而调整支撑柱整体的高度。本发明中的支撑柱结构简单、安装方便,可多次周转使用,降低施工成本,提高施工效率;支撑柱整体长度可调,可对不同高度的后浇带提供支撑力,避免裂缝的发生。
Post-cast strip construction method
一种后浇带施工方法
YIN WEI (author) / ZHENG YOUHUAN (author) / SONG YUFENG (author) / FU JIALI (author) / ZHU LICHENG (author) / YUAN TAO (author) / WU YINGCHENG (author) / LUO JIWEN (author) / LUO YUTING (author) / REN MANGUI (author)
2022-04-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Post-cast strip formwork and construction method for pouring post-cast strip
European Patent Office | 2021
|Folding type post-cast strip formwork and post-cast strip construction method
European Patent Office | 2024
|Foundation post-cast strip formwork and construction method for pouring post-cast strip
European Patent Office | 2024
|