A platform for research: civil engineering, architecture and urbanism
Novel partially-prefabricated concrete pier column structure and construction method
The invention relates to the technical field of concrete pier column equipment, in particular to a novel partially-prefabricated concrete pier column structure and a construction method.The novel partially-prefabricated concrete pier column structure comprises a foundation, a cast-in-place base, a partially-prefabricated section and a prefabricated cover beam, the cast-in-place base is fixedly connected to the upper end of the foundation, and the partially-prefabricated section is fixedly connected to the upper end of the cast-in-place base; the upper end position of the partial prefabricated section is fixedly connected with a prefabricated cover beam, the partial prefabricated section comprises a first prefabricated block, a first matching seat frame, a limiting fastening structure, a second prefabricated block and a second matching seat frame, the second prefabricated block is arranged at the bottom position of the inner end of the partial prefabricated section, and the side end position of the second prefabricated block is fixedly connected with the second matching seat frame; the upper end of the second matching seat frame is fixedly connected with the first matching seat frame, and the center of the first matching seat frame is fixedly connected with the first prefabricated block. Through the arrangement of the structure, the purpose of installation and connection of the concrete pier column is achieved.
本发明涉及混凝土墩柱设备技术领域,具体为一种新型部分预制混凝土墩柱结构及施工方法,包括基础、现浇底座、部分预制节段和预制盖梁,基础的上端位置固定连接有现浇底座,现浇底座的上端位置固定连接有部分预制节段,部分预制节段的上端位置固定连接有预制盖梁,部分预制节段包括第一预制块、第一配合座架、限位紧固结构、第二预制块和第二配合座架,第二预制块设在部分预制节段的内端底部位置,第二预制块的侧端位置固定连接有第二配合座架,第二配合座架的上端位置与第一配合座架相固定连接,第一配合座架的中心位置与第一预制块相固定连接。本发明通过结构的设置,实现混凝土墩柱的安装连接的目的。
Novel partially-prefabricated concrete pier column structure and construction method
The invention relates to the technical field of concrete pier column equipment, in particular to a novel partially-prefabricated concrete pier column structure and a construction method.The novel partially-prefabricated concrete pier column structure comprises a foundation, a cast-in-place base, a partially-prefabricated section and a prefabricated cover beam, the cast-in-place base is fixedly connected to the upper end of the foundation, and the partially-prefabricated section is fixedly connected to the upper end of the cast-in-place base; the upper end position of the partial prefabricated section is fixedly connected with a prefabricated cover beam, the partial prefabricated section comprises a first prefabricated block, a first matching seat frame, a limiting fastening structure, a second prefabricated block and a second matching seat frame, the second prefabricated block is arranged at the bottom position of the inner end of the partial prefabricated section, and the side end position of the second prefabricated block is fixedly connected with the second matching seat frame; the upper end of the second matching seat frame is fixedly connected with the first matching seat frame, and the center of the first matching seat frame is fixedly connected with the first prefabricated block. Through the arrangement of the structure, the purpose of installation and connection of the concrete pier column is achieved.
本发明涉及混凝土墩柱设备技术领域,具体为一种新型部分预制混凝土墩柱结构及施工方法,包括基础、现浇底座、部分预制节段和预制盖梁,基础的上端位置固定连接有现浇底座,现浇底座的上端位置固定连接有部分预制节段,部分预制节段的上端位置固定连接有预制盖梁,部分预制节段包括第一预制块、第一配合座架、限位紧固结构、第二预制块和第二配合座架,第二预制块设在部分预制节段的内端底部位置,第二预制块的侧端位置固定连接有第二配合座架,第二配合座架的上端位置与第一配合座架相固定连接,第一配合座架的中心位置与第一预制块相固定连接。本发明通过结构的设置,实现混凝土墩柱的安装连接的目的。
Novel partially-prefabricated concrete pier column structure and construction method
一种新型部分预制混凝土墩柱结构及施工方法
WANG HAIRUO (author) / CAI XIAONING (author) / CHEN SIYU (author) / WU JIANXU (author) / ZHAO JIAN (author) / WANG PENG (author) / WEN YONGXIN (author) / XU JINQUAN (author)
2022-05-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2021
|PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE
European Patent Office | 2017
|CONSTRUCTION METHOD FOR A PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE
European Patent Office | 2020
|